Login
TI Ref No : | 512043369 |
---|---|
Description : | Topographic Control Of The Construction Works Of The Track Connecting The Rn 8 At The Level Of Weekly Souk And The Tarred Road El Akkari Crossing Douar Ait Iba With A Length Of Approximately 3.15 Km To The Territorial Commune Ouled Hassoune To The Prefect |
Date : | 2024-12-18 |
Deadline : | 2025-06-16 |
Document Type : | Tenders |