Login
| TI Ref No : | 528130866 |
|---|---|
| Description : | Contract Awarded For R49 4901 Hulin - Fryšták realization Of The Construction Of A Section Of The Expressway In Category R 24.5 / 120. Construction Of A Part Of The Expressway With The Following Parameters: Length Of The Route 17.5 Km, 2 Interchanges (hol |
| Date : | 2026-01-29 |
| Deadline : | 2026-03-03 |
| Document Type : | Contracts |