Login
| TI Ref No : | 525379839 |
|---|---|
| Description : | Contract Awarded For Båstad Turning Track Ue to Make It Possible For Pågatåg To Turn Around In Connection With Båstad Station, A New Approximately 300 M Long Turning Track Must Be Built North Of Switch 101 On The Uptrack Side At The Båstad Norra Operatin |
| Date : | 2025-11-22 |
| Deadline : | 2027-03-05 |
| Document Type : | Contracts |