Login
| TI Ref No : | 521525870 |
|---|---|
| Description : | Monsoon Preparedness 2025-26 2 Ii - Monsoon Preparedness 2025 26 1 Ii - During The Monsoon Period Lot Of Waste , Debris And Other Unwanted Materials Which Are Dumped Into The Canal Causes Blocks Which Prevents Smooth Flow Of Water Through Canals.the Block |
| Date : | 2025-08-11 |
| Deadline : | 2025-11-07 |
| Document Type : | Contracts |