Login
TI Ref No : | 518842187 |
---|---|
Description : | Contract Awarded For 2. S-bahn Master Route Munich, Pu 553e.1 Preliminary Measure Fountain Production At Marienhof boring With Bore Diameter At Least 324 Mm: 195 M Bore With Bore Diameter At Least 368 Mm - Diagonal: 590m Bore With Drilling Diameter At Lea |
Date : | 2025-06-06 |
Deadline : | 2025-08-14 |
Document Type : | Contracts |