Login
TI Ref No : | 511781174 |
---|---|
Description : | Contract Awarded For: Designing And Author Supervision During Construction For The Reconstruction Of The 110 Kv Switchgear, For The Connection Of The Fec Owned By Albena Solar Ead In The Albena Substation 110/20 Kv design And Construction Supervision Dur |
Date : | 2024-12-11 |
Deadline : | 2025-03-03 |
Document Type : | Contracts |