Login
TI Ref No : | 500982927 |
---|---|
Description : | Design, Permitting And Construction To Improve Puunene Avenue Between Wakea Avenue And Kuihelani Highway: • Construction Of Two New Vehicular Travel Lanes; One In Each Direction, Along The Outside Edge Of The Existing Roadway • Construction Of A Shared Sh |
Date : | 2024-02-24 |
Deadline : | 2026-10-08 |
Document Type : | Contracts |