Login
TI Ref No : | 454952185 |
---|---|
Description : | Design, Construction, Supply, Assembly, Testing, Commissioning And Maintenance Of The Energy Storage System For The Third Island, Abbreviated As "bess Terceira System", Located On The Third Island, Az |
Date : | 2020-07-15 |
Deadline : | 2031-09-04 |
Document Type : | Contracts |