Filter Search


Defence


Location Summary Deadline
India Supply Of Lime Dust (q3), Phenyl Liquid (q3), Suthion (q3), Glyphosate (q3), Acid (toilet/floor Cleaner) (q3), Haripc (toilet Cleaner) (q3), Spray Pump (q3), Showel With Handle (q3), Punja With Handle (q3), Coconut Brooms (q3), Ppe Kits (q3), Safety Jacke 2024-05-20
-Qty-:-1
>India
-Qty-:-1
>Supply of Driving Training Simulator (MHA) (V2) (Q3)
Qty : 1
-Qty-:-1
>2024-05-20
India Supply Of Body(modification) /172 60 147 (q3), Body/172 60 148 (q3) Qty : 422 2024-05-20
India Supply of Motor Starting, Part No 3102766, Fuel Filter, Part No 4104822, Filter Coolant, Part No 4104821, Separator Fuel Water, Part No 3815424, Fill Breather, Part No X7437000047, Belt, Part No 3289569, Car Fan 12v, Part No Z7425000002, Altantor, Part No 4988274, Ignition Switch, Part No X787200005 2024-05-20
-Qty-:-40
>India
-Qty-:-40
>Supply Of Belt (q3).
Qty : 40
-Qty-:-40
>2024-05-20
India Supply , Installation , Testing & Commissioning Of Test Panel For Temperature Sensor Checking (tm/tfp & Converter Oil) Of Ac-3 Phase Locomotives As Per The Specification Enclosed Overleaf. [ Warranty Period: 30 Months After The Date Of Delivery. 2024-05-20
Saudi Arabia Rehabilitation Of Border Guard Armored Vehicles No. (7) 2024-05-20
United States Deployment / Squadron Gear 2024-05-20
India Translation/ Transliteration/ Transcreation/ Transcription Services - Translation; Per Word; Administrative, Agriculture, Health, Legal, Tourism, Finance Accounting, Marketing, Technology, Education, Defence, Aerospace, Pharmaceutical, Tax, Banki Qty : 1 2024-05-20
-Supply-Installation-Testing-&-Commissioning-Of-Sdh/drop-Mux-Stm-1-Of-Tejas-Make-As-Per-Tech-Spec.no.gr/sdh-04/03-March-05-With-Latest-Amendments-Or-Specifications-With-Optical-Aggregates-1.1.1-Equip>India -Supply-Installation-Testing-&-Commissioning-Of-Sdh/drop-Mux-Stm-1-Of-Tejas-Make-As-Per-Tech-Spec.no.gr/sdh-04/03-March-05-With-Latest-Amendments-Or-Specifications-With-Optical-Aggregates-1.1.1-Equip>Supply Of Supply Installation Testing & Commission
Supply Installation Testing & Commissioning Of Sdh/drop Mux Stm-1 Of Tejas Make As Per Tech Spec.no.gr/sdh-04/03 March 05 With Latest Amendments Or Specifications With Optical Aggregates 1.1.1 Equip
-Supply-Installation-Testing-&-Commissioning-Of-Sdh/drop-Mux-Stm-1-Of-Tejas-Make-As-Per-Tech-Spec.no.gr/sdh-04/03-March-05-With-Latest-Amendments-Or-Specifications-With-Optical-Aggregates-1.1.1-Equip>2024-05-20
Whats app