Filter Search


Transportation


Location Summary Deadline
-Widening-From-Two-Lane-To-Two-Lane-With-Paved-Shoulders-And-Strengthening-At-Km-1/2---2/4-Of-Bargur---Thirupathur-Road-Including-Cd-Works-At-Km-1/6,-1/8-And-2/2-(slm-81)>India -Widening-From-Two-Lane-To-Two-Lane-With-Paved-Shoulders-And-Strengthening-At-Km-1/2---2/4-Of-Bargur---Thirupathur-Road-Including-Cd-Works-At-Km-1/6,-1/8-And-2/2-(slm-81)>Krishnagiri (h) Candm Sub Division (slm-81)
Widening From Two Lane To Two Lane With Paved Shoulders And Strengthening At Km 1/2 - 2/4 Of Bargur - Thirupathur Road Including Cd Works At Km 1/6, 1/8 And 2/2 (slm-81)
-Widening-From-Two-Lane-To-Two-Lane-With-Paved-Shoulders-And-Strengthening-At-Km-1/2---2/4-Of-Bargur---Thirupathur-Road-Including-Cd-Works-At-Km-1/6,-1/8-And-2/2-(slm-81)>2025-10-23
-Consultancy-Services-For-Preparation-Of-Detailed-Project-Report-(dpr)-For-Construction-Of-Gola-Ring-Road-In-The-S>India -Consultancy-Services-For-Preparation-Of-Detailed-Project-Report-(dpr)-For-Construction-Of-Gola-Ring-Road-In-The-S>Consultancy Services For Preparation Of Detailed Project Report (dpr) For Construction Of Gola Ring Road In The State Of Uttar Pradesh.
Consultancy Services For Preparation Of Detailed Project Report (dpr) For Construction Of Gola Ring Road In The S
-Consultancy-Services-For-Preparation-Of-Detailed-Project-Report-(dpr)-For-Construction-Of-Gola-Ring-Road-In-The-S>2025-10-23
-Consultancy-Services-For-Preparation-Of-Detailed-Project-Report-(dpr)-For-Basti-Ring-Road-(phase-ii)-In-The-State-Of>India -Consultancy-Services-For-Preparation-Of-Detailed-Project-Report-(dpr)-For-Basti-Ring-Road-(phase-ii)-In-The-State-Of>Consultancy Services For Preparation Of Detailed Project Report (dpr) For Basti Ring Road (phase-ii) In The State Of Uttar Pradesh.
Consultancy Services For Preparation Of Detailed Project Report (dpr) For Basti Ring Road (phase-ii) In The State Of
-Consultancy-Services-For-Preparation-Of-Detailed-Project-Report-(dpr)-For-Basti-Ring-Road-(phase-ii)-In-The-State-Of>2025-10-23
-Widening-From-Single-Lane-To-Intermediate-Lane-And-Strengthening-At-Km-5/2-6/6,-7/4-8/4,-11/2-12/2-Of-National-Highways-7-To-Kadathikuttai-(via)-Samichettipatti-Road-Including-Widening-Of-Culvert-(slm-75)>India -Widening-From-Single-Lane-To-Intermediate-Lane-And-Strengthening-At-Km-5/2-6/6,-7/4-8/4,-11/2-12/2-Of-National-Highways-7-To-Kadathikuttai-(via)-Samichettipatti-Road-Including-Widening-Of-Culvert-(slm-75)>Dharmapuri (h) Candm Sub Division (slm-75)
Widening From Single Lane To Intermediate Lane And Strengthening At Km 5/2-6/6, 7/4-8/4, 11/2-12/2 Of National Highways-7 To Kadathikuttai (via) Samichettipatti Road Including Widening Of Culvert (slm-75)
-Widening-From-Single-Lane-To-Intermediate-Lane-And-Strengthening-At-Km-5/2-6/6,-7/4-8/4,-11/2-12/2-Of-National-Highways-7-To-Kadathikuttai-(via)-Samichettipatti-Road-Including-Widening-Of-Culvert-(slm-75)>2025-10-23
-Widening-From-Single-Lane-To-Intermediate-Lane-And-Strengthening-At-Km-14/0---17/8-Of-Nallampalli---Papparapatti-(via)-Nagarkoodal,-Indur,-Ganapatti-Road-Including-Widening-Of-Culvert-(slm-78)>India -Widening-From-Single-Lane-To-Intermediate-Lane-And-Strengthening-At-Km-14/0---17/8-Of-Nallampalli---Papparapatti-(via)-Nagarkoodal,-Indur,-Ganapatti-Road-Including-Widening-Of-Culvert-(slm-78)>Dharmapuri (h) Candm Sub Division (slm-78)
Widening From Single Lane To Intermediate Lane And Strengthening At Km 14/0 - 17/8 Of Nallampalli - Papparapatti (via) Nagarkoodal, Indur, Ganapatti Road Including Widening Of Culvert (slm-78)
-Widening-From-Single-Lane-To-Intermediate-Lane-And-Strengthening-At-Km-14/0---17/8-Of-Nallampalli---Papparapatti-(via)-Nagarkoodal,-Indur,-Ganapatti-Road-Including-Widening-Of-Culvert-(slm-78)>2025-10-23
India Construction Of In-stream Storage Structure (iss) At Patharla Across River Indra/sundar In The District Bolangir Including Hydro-mechanical Works, Power Connectivity Work S, Road Connectivity, Staff Quarters Including Survey, Investigation, Planning. 2025-10-23
-Widening-And-Strengthening-To-Government-Roads-Including-Widening-Of-Culvert,-Reconstruction-Of-Culvert-And-Construction-Of-Protective-Works-In-Dharmapuri-(h)-Candm-Sub-Division-(slm-80)>India -Widening-And-Strengthening-To-Government-Roads-Including-Widening-Of-Culvert,-Reconstruction-Of-Culvert-And-Construction-Of-Protective-Works-In-Dharmapuri-(h)-Candm-Sub-Division-(slm-80)>Dharmapuri (h) Candm Sub Division (slm-80)
Widening And Strengthening To Government Roads Including Widening Of Culvert, Reconstruction Of Culvert And Construction Of Protective Works In Dharmapuri (h) Candm Sub Division (slm-80)
-Widening-And-Strengthening-To-Government-Roads-Including-Widening-Of-Culvert,-Reconstruction-Of-Culvert-And-Construction-Of-Protective-Works-In-Dharmapuri-(h)-Candm-Sub-Division-(slm-80)>2025-10-23
Germany 1/dlii5/pb389 - Spare Parts With Drawing Rates - 6002910897 2025-10-23
Germany 6002905720 Degree Of An Rv On The Operation Of A Wood Chip Schnitzel System For Heat Delivery At The Baumholder Location Over A Contract Duration Of 4 Years 2025-10-23
Germany 1/dlii5/pb389 - Spare Parts With Drawing Rates - 6002910897 2025-10-23
Whats app