Filter Search


Transportation


Location Summary Deadline
India Procurement Of Spares For Il-78 Aircraft 2025-10-23
India Procurement Of Spares For Il-78 Aircraft 2025-10-23
Slovakia Modernization Of The Žilina Railway Line - Košice, Section Of Poprad Tatry (outside) - Krompachy. Part 2025-10-23
India Procurement Of Mi-series Helicopter Spares 2025-10-23
India Set Of Side Wall Assly And Roof Complete For Lhb Ac 3 Tier Coach 2025-10-23
India Construction Of Four Lane Elevated Corridor Along East Coast Road (ecr) From Design Chainage Km.11/480 - 11/800 (west Avenue Road) And Upto 24/780 (ecr) Thiruvanmiyur To Uthandi In Sh-49 On Hybrid Annuity Mode (ham). 2025-10-23
India Bogie Frame Complete .#* Bogie Frame Complete (new 16.25 T Bogie For Non-ac Coaches) With 4.5 Kw Alternator To Icf Drg No.- Icf/sk3-0-3-047 (sheet-1&2), Alt.- Nil., R dso Spec. C-9202, Rev-2. [ Warranty Period: 60 Months After The Date Of Delivery ] [quan 2025-10-23
India Set Of Retention Tank For 3-phase Memu/tc Coaches .#* Set Of Retention Tank For 3-phase Memu/tc Coaches As Per Drawing: Dmu/tc/ss -6-3-001 Alt Dr Col-iv Item No. 8 And 9, Note: Safety Clause Must Be Followed According T o Annexure-a Of Dy.cple-ii L.no.rcf 2025-10-23
Italy Brindisi Cartotto Barrack 2025-10-23
Poland Performing The Function Of A Contract Engineer In The Implementation Of The Investment Entitled Design And Construction Of The Lódz Recycling Center In Lódz At 1 Wystawska Street. 2025-10-23
Whats app