Filter Search


Transportation


Location Summary Deadline
Switzerland Drives In The Lower Pan Handle 2025-09-15
France Design And Realization Of A Passenger Boat For The Fouras-aix Link 2025-09-15
India Sealed Glass .#* Sealed Glass Unit For Lhb Fixed Window To Rcf Drg. No. Lw-54104 Alt-i. Confirming To Mdts- 089 Rev-4. [ Warranty Period: 30 Months After The Date Of Delivery ] [quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Va 2025-09-15
Saudi Arabia Creation, Operation, Maintenance And Investment Of Land Parts For Light Industry Activities On Parts Numbers (11 To 14) Area (d) Plan No. 853 West Dammam 2025-09-15
India Procurement Of Breaker Circuit Dynamic Brake Control Etc. .#* Breaker Circuit Dynamic Brake Control 10 Amps To Emd Pt.no.9322826 For W dg 4 Locomotives. [ Warranty Period: 30 Months After The Date Of Delivery ] [quantity Tolerance (+/-): 5 %age , Item Cat 2025-09-15
France Market For The Supply And Installation Of Lighting At The House Of Entrepreneurship And Transitions From The Nantes Stnazaire Chamber Of Commerce And Industry In Stherblain 2025-09-15
France Market For The Supply And Installation Of Lighting At The Maison De Lentrepreneuriat And Transitions From The Nantes St-nazaire Chamber Of Commerce And Industry In St-herblain 2025-09-15
France Market For The Renovation Of Public Lighting Facilities Of The Municipalities Of Sand, Grillon (lot No. 1) And Lapalud (lot No. 2) 2025-09-15
-Design,-Build,-Finance,-Operate-And-Transfer-(dbfot)-Of-Megapode-Resort-At-Sri-Vijaya-Puram-Through-Ppp>India -Design,-Build,-Finance,-Operate-And-Transfer-(dbfot)-Of-Megapode-Resort-At-Sri-Vijaya-Puram-Through-Ppp>Dbfot Of Megapode Resort
Design, Build, Finance, Operate And Transfer (dbfot) Of Megapode Resort At Sri Vijaya Puram Through Ppp
-Design,-Build,-Finance,-Operate-And-Transfer-(dbfot)-Of-Megapode-Resort-At-Sri-Vijaya-Puram-Through-Ppp>2025-09-15
-Development-Of-5-star-Eco-tourism-Resort-At-Aves-Island,-Ani-On-Ppp-Basis-For-A-Concession-Period-Of-75-Years>India -Development-Of-5-star-Eco-tourism-Resort-At-Aves-Island,-Ani-On-Ppp-Basis-For-A-Concession-Period-Of-75-Years>Development Of 5-star Eco-tourism Resort At Aves Island, Ani
Development Of 5-star Eco-tourism Resort At Aves Island, Ani On Ppp Basis For A Concession Period Of 75 Years
-Development-Of-5-star-Eco-tourism-Resort-At-Aves-Island,-Ani-On-Ppp-Basis-For-A-Concession-Period-Of-75-Years>2025-09-15
Whats app