Filter Search


Transportation


Location Summary Deadline
Singapore Implementation And Comprehensive Maintenance Of Crash-rated Vehicle Security Barriers (vsb) At Woodlands And Tuas Checkpoints 2025-12-22
-Design,-Supply,-Installation-And-Comissioning-Of-Caaqms-And-Cems-And-Connecting-Data-To-Cpcb/appcb-Portal-Connectivity-Along-With-Camc-For-5-Years-At-Ongc-Odalarevu-Onshore-Terminal,-Kak>India -Design,-Supply,-Installation-And-Comissioning-Of-Caaqms-And-Cems-And-Connecting-Data-To-Cpcb/appcb-Portal-Connectivity-Along-With-Camc-For-5-Years-At-Ongc-Odalarevu-Onshore-Terminal,-Kak>Design Supply Installation And Comissioning Of Caaqms And Cems
Design, Supply, Installation And Comissioning Of Caaqms And Cems And Connecting Data To Cpcb/appcb Portal Connectivity Along With Camc For 5 Years At Ongc Odalarevu Onshore Terminal, Kak
-Design,-Supply,-Installation-And-Comissioning-Of-Caaqms-And-Cems-And-Connecting-Data-To-Cpcb/appcb-Portal-Connectivity-Along-With-Camc-For-5-Years-At-Ongc-Odalarevu-Onshore-Terminal,-Kak>2025-12-22
India Bracket For Empty Load Change Over .#* Bracket For Empty Load Change Over (small) For Boxn Wagon To Irs Drg. No. W/bg-6349, Alt-2 And Material Conforming To Is: 2062-2011 With A mendment No. 1 Of Nov. 2012, Grade- E 250 A. [ Warranty Period: 30 Months Aft 2025-12-22
India Body Pillar Part (b.g). Drawing No: Icfs Drg. No. Icf/sk-1272, Alt. F, Item No. 4. .#* Body Pillar Part (b.g). Drawing No: Icfs Drg. No. Icf/sk-1272, Alt. F, Item No. 4. Matl.& specn: Irs: M-41/ 97, Amnd. 2 / March 2006. [ Warranty Period: 30 Months After 2025-12-22
India Procurement Of Aspj Pods For Su-30 Mki Aircraft 2025-12-22
Colombia Public Service Concession For Land, Automotive, Urban, And Mass Passenger Transportation Of The Sitm Subsystem Of The Amco Dqs 2025-12-22
Japan Medical Suppliese (refer To Attached Sheet) 2025-12-22
-Procurement-Cum-Maintenance-Of-2856-Cars-In-Configuration-Of-12/15/18-car-Air-conditioned-Vande-Metro-(suburban)-Broad-Gauge-Rakes-With-Comprehensive-Maintenance-For-35-Years-Including-Setting-Up-Of-2-New-Maintenance-Depots-Und>India -Procurement-Cum-Maintenance-Of-2856-Cars-In-Configuration-Of-12/15/18-car-Air-conditioned-Vande-Metro-(suburban)-Broad-Gauge-Rakes-With-Comprehensive-Maintenance-For-35-Years-Including-Setting-Up-Of-2-New-Maintenance-Depots-Und>Mrvc/g/iiia/rs/101/r1
Procurement Cum Maintenance Of 2856 Cars In Configuration Of 12/15/18-car Air-conditioned Vande Metro (suburban) Broad Gauge Rakes With Comprehensive Maintenance For 35 Years Including Setting Up Of 2 New Maintenance Depots Und
-Procurement-Cum-Maintenance-Of-2856-Cars-In-Configuration-Of-12/15/18-car-Air-conditioned-Vande-Metro-(suburban)-Broad-Gauge-Rakes-With-Comprehensive-Maintenance-For-35-Years-Including-Setting-Up-Of-2-New-Maintenance-Depots-Und>2025-12-22
India Primary Vertical Damper For Fiat Bogie Of All Lhb Coaches To Drg. No. rdso/cg/drg/21047, Alt. 3. .#* Primary Vertical Damper For Fiat Bogie Of All Lhb Coaches To Drg. No. Rdso/cg/ drg/21047, Alt. 3 And Confirming To Rdso Specification No. Rdso/cg-18005, R 2025-12-22
India Poh Kit. .#* Poh Kit For Overhauling Of Kbil Make Main Air Compressor Of Emu Rakes. Kit Consist O f 5 Items. (1)set Of Lp-hp Cylinder = 3 Nos (2 Nos Lp & 1 No Hp) . (2) Set Of Lp - Hp Piston =3 nos (2 Nos Lp & 1 No Hp) (3) Set Of Lp- Hp Valve = 3 Nos (2 N 2025-12-22
Whats app