Filter Search


Transportation


Location Summary Deadline
-Improvement-Of-Bituminious-Road-At-Jhol-Math-In-The-Ward-No-01-Under-Sainthia-Municipality.>India -Improvement-Of-Bituminious-Road-At-Jhol-Math-In-The-Ward-No-01-Under-Sainthia-Municipality.>Wbmad/sm/engg.sec/dma/07 Of 2025-26
Improvement Of Bituminious Road At Jhol Math In The Ward No-01 Under Sainthia Municipality.
-Improvement-Of-Bituminious-Road-At-Jhol-Math-In-The-Ward-No-01-Under-Sainthia-Municipality.>2025-10-29
-Upgradation-Of-Existing-C.c-Road-With-Paver-Block-From-1)-Khokon-Dutta-House-To-Nadir-Band-In-The-Ward-No.---14-Under-Sainthia-Municipality.>India -Upgradation-Of-Existing-C.c-Road-With-Paver-Block-From-1)-Khokon-Dutta-House-To-Nadir-Band-In-The-Ward-No.---14-Under-Sainthia-Municipality.>Wbmad/sm/engg.sec/dma/07 Of 2025-26
Upgradation Of Existing C.c Road With Paver Block From 1) Khokon Dutta House To Nadir Band In The Ward No. - 14 Under Sainthia Municipality.
-Upgradation-Of-Existing-C.c-Road-With-Paver-Block-From-1)-Khokon-Dutta-House-To-Nadir-Band-In-The-Ward-No.---14-Under-Sainthia-Municipality.>2025-10-29
-Construction-Of-C.c.-Road-With-Guard-Wall-From-Existing-Municipal-High-Drain-To-Mayurakshi-River-Bandh-At-Hamenta-Basu-Pally-In-The-Ward-No--14,-Under-Sainthia-Municipality.>India -Construction-Of-C.c.-Road-With-Guard-Wall-From-Existing-Municipal-High-Drain-To-Mayurakshi-River-Bandh-At-Hamenta-Basu-Pally-In-The-Ward-No--14,-Under-Sainthia-Municipality.>Wbmad/sm/engg.sec/dma/07 Of 2025-26
Construction Of C.c. Road With Guard Wall From Existing Municipal High Drain To Mayurakshi River Bandh At Hamenta Basu Pally In The Ward No- 14, Under Sainthia Municipality.
-Construction-Of-C.c.-Road-With-Guard-Wall-From-Existing-Municipal-High-Drain-To-Mayurakshi-River-Bandh-At-Hamenta-Basu-Pally-In-The-Ward-No--14,-Under-Sainthia-Municipality.>2025-10-29
India End Wall Assembly For Lhb Gs & Scn .#* End Wall Assembly For Lhb Gs & Scn (amrit Bharat ) Coaches Note:-(1)in Dra wings "mig Welding (131) Is To Be Read As Tig Welding (141)" As Per Design Letter No. Md4 6231 Dated 16.03.2024. (2)firm Shall Collect All La 2025-10-29
-Selection-Of-Consultant-For-Pre-feasibility-Studies-For-Finalization-Of-Mw-Capacity-Followed-By-Preparation-Of-Detailed-Project-Report-For-Floating-Solar-Pv-Project-At-Kangsabati-Mukutmanipur-Dam-In-Bankur>India -Selection-Of-Consultant-For-Pre-feasibility-Studies-For-Finalization-Of-Mw-Capacity-Followed-By-Preparation-Of-Detailed-Project-Report-For-Floating-Solar-Pv-Project-At-Kangsabati-Mukutmanipur-Dam-In-Bankur>Wbsedcl/spgd/dpr/mukut/nit78 Dtd 10.09.2025
Selection Of Consultant For Pre-feasibility Studies For Finalization Of Mw Capacity Followed By Preparation Of Detailed Project Report For Floating Solar Pv Project At Kangsabati Mukutmanipur Dam In Bankur
-Selection-Of-Consultant-For-Pre-feasibility-Studies-For-Finalization-Of-Mw-Capacity-Followed-By-Preparation-Of-Detailed-Project-Report-For-Floating-Solar-Pv-Project-At-Kangsabati-Mukutmanipur-Dam-In-Bankur>2025-10-29
Germany Public Service Mandate In Rail Passenger Transport Within The Meaning Of Art. 5 Para. 1 Of The Regulation (ec) No. 1370/2007 From October 23, 2007 2025-10-30
Sweden Dis El Revision By Mainary Agreement 2025-10-30
South Africa The Appointment Of A Service Provider For The Supply, Delivery, Installation, And Commissioning Of Radar Systems And All Ancillary Equipment As Required At The Fape, Fael, Fakn, Fale, Fabl, Fagg, Ata, Sutherland, And De Aar Sites With The Associated Suppo 2025-10-30
South Africa The Appointment Of A Service Provider For The Supply Delivery Installation And Commissioning Of Radar Systems And All Ancillary Equipment As Required At The Fape Fael Fakn Fale Fabl Fagg Ata Sutherland And De Aar Sites With The Associated Support And Main 2025-10-30
Switzerland Cavezzolo Viaduct Designer - Tram -treno Del Luganese Network (rttl) - Priority Stage 2025-10-30
Whats app