Filter Search


Transportation


Location Summary Deadline
-Repair-To-Certain-Roads-At-Af-Stn-Ambala-Under-Ge-(af)-Ambala>India -Repair-To-Certain-Roads-At-Af-Stn-Ambala-Under-Ge-(af)-Ambala>Cwe/af Amb/amb-29/2025-26 Repair To Certain Roads At Af Stn Ambala Under Ge (af) Ambala
Repair To Certain Roads At Af Stn Ambala Under Ge (af) Ambala
-Repair-To-Certain-Roads-At-Af-Stn-Ambala-Under-Ge-(af)-Ambala>2025-10-14
India Flap Door Arrangement .#* Flap Door Arrangement(reduced Height) For Boxnhl Wagon As Per Rdso Drg. No. W d-23018-s-02, Alt-3, Item No. 3, 4, 5a, 5b, 5c, 10, 12, 13, 14 And 16 In Assembled Condition. Material An d Specification As Per Drawing. [ Warranty Pe 2025-10-14
India Draft Key Cotter For Draw Gear. .#* Draft Key Cotter For Draw Gear. Drawing No.:- Rdso/ Sk -99003 , Alt. ( 4 ), Item - 4 S pecification:- C-9509 (rev -2) & Amndt.-01 Of Oct.2016 [ Warranty Period: 30 Months After The Date of Delivery ] [quantity Tolerance 2025-10-14
India Dungri Cloth .#* Dungri Cloth, Cotton Khadi, Blue 91 Cm Wide To Spec.no.is:3778 / 1993 With Ame ndment No.1, March 2002 (reaffirmed 2003) [ Warranty Period: 30 Months After The Date Of Delive ry ] [quantity Tolerance (+/-): 5 %age , Item Category : Normal 2025-10-14
India Modified Equaliser Linkage For Wag-7 .#* Modified Equaliser Linkage For Wag-7 Locomotives As Per Drg. No. Sr.dee/rs/ed/mech-106 W ith Manganese Steel Bushes Only. [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2025-10-14
India Construction And 06 Year Routine Maintenance Work For Rural Road/bridge Under Component Of Mukhya Mantri Gram Sampark Yojana. Road, Bridge 2025-10-14
India Construction And 06 Year Routine Maintenance Work For Rural Road/bridge Under Component Of Mukhya Mantri Gram Sampark Yojana. Road, Bridge 2025-10-14
India Provision Of Side Pathway In Various Psc Girder Bridges For Btc-kge Section Under the Jurisdiction Of Sse/br/nainpur In Nagpur Division 2025-10-14
India Provision Of Side Pathway At Psc Girder Bridge No.24 K Dn (2x12.20m), 26 K Dn (3x12.20m), 36 K Dn (3x12.20m), 40 K Dn ( 4x12.20m), 4cic ( 3x12.20m) And 211 3rd Line (1x12.20m) Under The Jurisdiction Of Sse/br/shahdol In Bilaspur Division 2025-10-14
India Bangalore -jolarpettai Section: Provision Of Safety Fencing With W-beam Metal barrier For 35.60kms (aden/sbc Section) In Connection With Increasing Sectional speed From 110kmph To 130kmph. Maintenance Period Is 12months. (two Packet) 2025-10-14
Whats app