Filter Search


Transportation


Location Summary Deadline
India Construction Of Cc Road From Prabir Adhikari House To Raghunath Adhikari At Baishnabpara Under Pahalanpur Gp Within Raina-ii Development Block 2025-10-13
India Construction Of Cc Road From Binodpur Patrapara Chittaranjan Patra House To Pal Pukur At Binodpur Patra Para Under Pahalanpur Gp Within Raina-ii Development Block 2025-10-13
-Construction-Of-Concrete-Road-At-Kajipara-Dhanmath-From-H/o.-Tabarak-To-H/o.-Sumi-At-Ward-No.-23-Under-Baidyabati-Municipality>India -Construction-Of-Concrete-Road-At-Kajipara-Dhanmath-From-H/o.-Tabarak-To-H/o.-Sumi-At-Ward-No.-23-Under-Baidyabati-Municipality>Et- 06/15th Fc (ut) And Idw And 5th Sfc/2025-26 Sl. No. 3
Construction Of Concrete Road At Kajipara Dhanmath From H/o. Tabarak To H/o. Sumi At Ward No. 23 Under Baidyabati Municipality
-Construction-Of-Concrete-Road-At-Kajipara-Dhanmath-From-H/o.-Tabarak-To-H/o.-Sumi-At-Ward-No.-23-Under-Baidyabati-Municipality>2025-10-13
India Construction Of Cc Road From Sujauddin House To Dayal Choudhury House Under Arui Gp Within Raina-ii Development Block 2025-10-13
Switzerland Ebp-492 Procurement Of personnel Rental And Services For Purchasing 2025-10-13
Syria Arab Republic Selling 1-10000/ Kg Of A Damaged Wooden Kg 2- 2500/ Kg Damaged Wooden Columns 2025-10-13
France Driving And Monitoring Services Of The Santa Fresh Device For The Epic Controls Metropolitan Transportation. 2025-10-13
India Supply Of Differential Scanning Calorimetry (dsc) System Differential Scanning Calorimetry (dsc) System 2025-10-13
-Development-Of-Median-Of-Road-Infront-Of-Metro-Station-(beside-Em-Bypass-Service-Road)-In-Ward-No-58>India -Development-Of-Median-Of-Road-Infront-Of-Metro-Station-(beside-Em-Bypass-Service-Road)-In-Ward-No-58>Kmc/dg(c)/br-vii/58/62/25-26
Development Of Median Of Road Infront Of Metro Station (beside Em Bypass Service Road) In Ward No 58
-Development-Of-Median-Of-Road-Infront-Of-Metro-Station-(beside-Em-Bypass-Service-Road)-In-Ward-No-58>2025-10-13
India Foot Step Arrangement For Slrd Coaches. .#* Foot Step Arrangement For Slrd Coaches As Per Drg.no. Icf/std-2-4-001 Alt q/nil Required Item No. 1,5,6,8,9,10 Of Column Iii And Item No.7 Of Column No. Iv. [ Warranty period: 30 Months After The Date Of Delive 2025-10-13
Whats app