Filter Search


Transportation


Location Summary Deadline
United States On-aircraft Counter-small Unmanned Aircraft System 2024-08-28
Belgium 57/33/2/24/007 - Automating The Bundle Ordering - Antwerp-port 2024-08-28
-Foot-Step-Assly-Cat-No.r/11/0065-C&d-No.h319/431-To-H319/439-As-Per-Drg.no.-1209-00.240-202-Ref:-1-To-8-Alt-2-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]>India -Foot-Step-Assly-Cat-No.r/11/0065-C&d-No.h319/431-To-H319/439-As-Per-Drg.no.-1209-00.240-202-Ref:-1-To-8-Alt-2-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]>Supply Of Foot Step Assly, Pl No. 29120238
Foot Step Assly Cat No.r/11/0065 C&d No.h319/431 To H319/439 As Per Drg.no. 1209-00.240-202 Ref: 1 To 8 Alt 2 [ Warranty Period: 30 Months After The Date Of Delivery ]
-Foot-Step-Assly-Cat-No.r/11/0065-C&d-No.h319/431-To-H319/439-As-Per-Drg.no.-1209-00.240-202-Ref:-1-To-8-Alt-2-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]>2024-08-28
-Mn-Leg-Liner-As-Per-Drg.-No.-A3/99/cnb/1522/5031,-Alt.-A,-80-Percent-Ref.3-And-20percent-Ref.4-[size-169x35x5-Mm-And-169x35x3-Mm.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]>India -Mn-Leg-Liner-As-Per-Drg.-No.-A3/99/cnb/1522/5031,-Alt.-A,-80-Percent-Ref.3-And-20percent-Ref.4-[size-169x35x5-Mm-And-169x35x3-Mm.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]>Supply Of Mn Leg Liner As Per Drg.
Mn Leg Liner As Per Drg. No. A3/99/cnb/1522/5031, Alt. A, 80 Percent Ref.3 And 20percent Ref.4 [size 169x35x5 Mm And 169x35x3 Mm. [ Warranty Period: 30 Months After The Date Of Delivery ]
-Mn-Leg-Liner-As-Per-Drg.-No.-A3/99/cnb/1522/5031,-Alt.-A,-80-Percent-Ref.3-And-20percent-Ref.4-[size-169x35x5-Mm-And-169x35x3-Mm.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]>2024-08-28
-Set-Of-Pneumatic-Horn-For-3-phase-Locomotive,-One-Set-Consist-Of-2-Items-4-Nos.-(1)-Horn-Low-Tone:-As-Per-Ftrtil-Pt.-No.-714007000-Or-Elgi-Pt.-No.-S-07026-Or-Kbil-Pt.-No.-C217943-Conforming-To>India -Set-Of-Pneumatic-Horn-For-3-phase-Locomotive,-One-Set-Consist-Of-2-Items-4-Nos.-(1)-Horn-Low-Tone:-As-Per-Ftrtil-Pt.-No.-714007000-Or-Elgi-Pt.-No.-S-07026-Or-Kbil-Pt.-No.-C217943-Conforming-To>Supply Of Set Of Pneumatic Horn For 3-phase Locomotive,
Set Of Pneumatic Horn For 3-phase Locomotive, One Set Consist Of 2 Items 4 Nos. (1) Horn Low Tone: As Per Ftrtil Pt. No. 714007000 Or Elgi Pt. No. S-07026 Or Kbil Pt. No. C217943 Conforming To
-Set-Of-Pneumatic-Horn-For-3-phase-Locomotive,-One-Set-Consist-Of-2-Items-4-Nos.-(1)-Horn-Low-Tone:-As-Per-Ftrtil-Pt.-No.-714007000-Or-Elgi-Pt.-No.-S-07026-Or-Kbil-Pt.-No.-C217943-Conforming-To>2024-08-28
Germany Implementation Of Traffic Safety Measures (tree Inspection And Tree Care) On Properties Of The Rostock Directorate And The Northern Regional Area 2024-08-28
India Rfp For Replacement Refurbishment Of Doppler Velocity Sensor (group Ii Avionics Aggregates) Of Mi 17 Series Aircraft 2024-08-28
Sweden The Procurement Refers To A Framework Agreement For The Ongoing Purchase Of Assembly Boxes, Detailed Information About Items According To The Attached Price Matrix. Volume Is Estimated At Around 20-25 Pieces Per Year. The Volume Is An Estimate And Provide 2024-08-28
Russian Federation Supply Of Quadcopter 2024-08-28
France Supply And Delivery Of Public Lighting Equipment For The City Of Quimper (relaunch Of Lots 2 And 4 Of Consultation 0v24003) 2024-08-28
Whats app