Filter Search


Transportation


Location Summary Deadline
India Supply Of Door Mechanism Complete As Per Rcf Drg.no.-lw56353, Alt.-a, Item No.-1 To 27, Material Specification As Per Drawing. Make To Be Asper Rdso Spec [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2026-01-16
-Construction-Of-Cc-Road-From-House-Of-Mojaffar-To-Basir-Sk-Apas/01/055/192/0009>India -Construction-Of-Cc-Road-From-House-Of-Mojaffar-To-Basir-Sk-Apas/01/055/192/0009>27/mgp/2025-26 _12
Construction Of Cc Road From House Of Mojaffar To Basir Sk Apas/01/055/192/0009
-Construction-Of-Cc-Road-From-House-Of-Mojaffar-To-Basir-Sk-Apas/01/055/192/0009>2026-01-16
India Providing Metal Spreading And Kerb Wall In 220/132/33kv Yard At 220kv Substation, Gajuwaka In Visakhapatnam Dt 2026-01-16
-Construction-Of-Concrete-Road-2.5-Meter-Wide-In-I)-Laxmikanta-Banerjee-To-South-Side-End-Point-Ii)-Sitala-Temple-To-The-Adjoined-Of-Ward-No.-2-(near-Ganguly-Pond)-Iii)-Near-Kali-Mandir-And-Other-Different-Location-At-Slum--n>India -Construction-Of-Concrete-Road-2.5-Meter-Wide-In-I)-Laxmikanta-Banerjee-To-South-Side-End-Point-Ii)-Sitala-Temple-To-The-Adjoined-Of-Ward-No.-2-(near-Ganguly-Pond)-Iii)-Near-Kali-Mandir-And-Other-Different-Location-At-Slum--n>Wbmad/ulb/rm/niet-15/sl1
Construction Of Concrete Road 2.5 Meter Wide In I) Laxmikanta Banerjee To South Side End Point Ii) Sitala Temple To The Adjoined Of Ward No.-2 (near Ganguly Pond) Iii) Near Kali Mandir And Other Different Location At Slum -n
-Construction-Of-Concrete-Road-2.5-Meter-Wide-In-I)-Laxmikanta-Banerjee-To-South-Side-End-Point-Ii)-Sitala-Temple-To-The-Adjoined-Of-Ward-No.-2-(near-Ganguly-Pond)-Iii)-Near-Kali-Mandir-And-Other-Different-Location-At-Slum--n>2026-01-16
-Construction-Of-Concrete-Road-2.5-Meter-Wide-In-I)-Kantagola-Bagdi-Polli(s.c.-010)-Ii)-Pandua-Dhara-Polli(s.c.-031)-Iii)-Manoharpur-Hati-Polli(s.c.-032)-And-Other-Different-Lacation-Of-Slum-And-Non-Slum-Area-In-Ward-No.-10>India -Construction-Of-Concrete-Road-2.5-Meter-Wide-In-I)-Kantagola-Bagdi-Polli(s.c.-010)-Ii)-Pandua-Dhara-Polli(s.c.-031)-Iii)-Manoharpur-Hati-Polli(s.c.-032)-And-Other-Different-Lacation-Of-Slum-And-Non-Slum-Area-In-Ward-No.-10>Wbmad/ulb/rm/niet-15/sl10
Construction Of Concrete Road 2.5 Meter Wide In I) Kantagola Bagdi Polli(s.c.-010) Ii) Pandua Dhara Polli(s.c.-031) Iii) Manoharpur Hati Polli(s.c.-032) And Other Different Lacation Of Slum And Non Slum Area In Ward No.-10
-Construction-Of-Concrete-Road-2.5-Meter-Wide-In-I)-Kantagola-Bagdi-Polli(s.c.-010)-Ii)-Pandua-Dhara-Polli(s.c.-031)-Iii)-Manoharpur-Hati-Polli(s.c.-032)-And-Other-Different-Lacation-Of-Slum-And-Non-Slum-Area-In-Ward-No.-10>2026-01-16
-Construction-Of-Concrete-Road-2.5-Meter-Wide-In-I)-From-The-Deo-pur-Primary-School-To-The-House-Of-Uttam-Chatterjee-Ii)-From-The-Bishalakshmi-Mandir-To-The-House-Of-Uttam-Ghosh-Iii)-From-The-House-Of-Ajit-Malas-To-The-House>India -Construction-Of-Concrete-Road-2.5-Meter-Wide-In-I)-From-The-Deo-pur-Primary-School-To-The-House-Of-Uttam-Chatterjee-Ii)-From-The-Bishalakshmi-Mandir-To-The-House-Of-Uttam-Ghosh-Iii)-From-The-House-Of-Ajit-Malas-To-The-House>Wbmad/ulb/rm/niet-15/sl11
Construction Of Concrete Road 2.5 Meter Wide In I) From The Deo-pur Primary School To The House Of Uttam Chatterjee Ii) From The Bishalakshmi Mandir To The House Of Uttam Ghosh Iii) From The House Of Ajit Malas To The House
-Construction-Of-Concrete-Road-2.5-Meter-Wide-In-I)-From-The-Deo-pur-Primary-School-To-The-House-Of-Uttam-Chatterjee-Ii)-From-The-Bishalakshmi-Mandir-To-The-House-Of-Uttam-Ghosh-Iii)-From-The-House-Of-Ajit-Malas-To-The-House>2026-01-16
-Construction-Of-Concrete-Road-2.5-Meter-Wide-In-I)-At-Panja-Para-Ii)-Main-Road-To-The-House-Of-Siraj-Mal-Iii)-Fom-The-House-Of-Kartik-Pal-Tothe-House-Of-Madan-Pal-At-Kumor-Palli-Iv)-From-The-House-Of-Jiban-Santra-To-The-Digh>India -Construction-Of-Concrete-Road-2.5-Meter-Wide-In-I)-At-Panja-Para-Ii)-Main-Road-To-The-House-Of-Siraj-Mal-Iii)-Fom-The-House-Of-Kartik-Pal-Tothe-House-Of-Madan-Pal-At-Kumor-Palli-Iv)-From-The-House-Of-Jiban-Santra-To-The-Digh>Wbmad/ulb/rm/niet-15/sl8
Construction Of Concrete Road 2.5 Meter Wide In I) At Panja Para Ii) Main Road To The House Of Siraj Mal Iii) Fom The House Of Kartik Pal Tothe House Of Madan Pal At Kumor Palli Iv) From The House Of Jiban Santra To The Digh
-Construction-Of-Concrete-Road-2.5-Meter-Wide-In-I)-At-Panja-Para-Ii)-Main-Road-To-The-House-Of-Siraj-Mal-Iii)-Fom-The-House-Of-Kartik-Pal-Tothe-House-Of-Madan-Pal-At-Kumor-Palli-Iv)-From-The-House-Of-Jiban-Santra-To-The-Digh>2026-01-16
-Construction-Of-Pcc-Road-From-Alok-Dhang-House-To-Rajendra-Jha-House-Scheme-Id-Apas/01/280/285/0001-Under-Ballavpur-Gp-Raniganj-Psconstruction-Of-Pcc-Road-From-Alok-Dhang-House-To-Rajendra-Jha-House-Scheme-Id-Apas/01/280/285/0001-Under>India -Construction-Of-Pcc-Road-From-Alok-Dhang-House-To-Rajendra-Jha-House-Scheme-Id-Apas/01/280/285/0001-Under-Ballavpur-Gp-Raniganj-Psconstruction-Of-Pcc-Road-From-Alok-Dhang-House-To-Rajendra-Jha-House-Scheme-Id-Apas/01/280/285/0001-Under>105/apas/2025
Construction Of Pcc Road From Alok Dhang House To Rajendra Jha House Scheme Id Apas/01/280/285/0001 Under Ballavpur Gp Raniganj Psconstruction Of Pcc Road From Alok Dhang House To Rajendra Jha House Scheme Id Apas/01/280/285/0001 Under
-Construction-Of-Pcc-Road-From-Alok-Dhang-House-To-Rajendra-Jha-House-Scheme-Id-Apas/01/280/285/0001-Under-Ballavpur-Gp-Raniganj-Psconstruction-Of-Pcc-Road-From-Alok-Dhang-House-To-Rajendra-Jha-House-Scheme-Id-Apas/01/280/285/0001-Under>2026-01-16
-Construction-Of-Pcc-Road-From-Payer-Bandh-Notun-Basti-Sumit-Gorai-House-To-Soumen-Chandra-House-Apas-Scheme-Id-Apas012802890014-Under-Ballavpur-Gp-Raniganj-Ps>India -Construction-Of-Pcc-Road-From-Payer-Bandh-Notun-Basti-Sumit-Gorai-House-To-Soumen-Chandra-House-Apas-Scheme-Id-Apas012802890014-Under-Ballavpur-Gp-Raniganj-Ps>88/apas/2025
Construction Of Pcc Road From Payer Bandh Notun Basti Sumit Gorai House To Soumen Chandra House Apas Scheme Id Apas012802890014 Under Ballavpur Gp Raniganj Ps
-Construction-Of-Pcc-Road-From-Payer-Bandh-Notun-Basti-Sumit-Gorai-House-To-Soumen-Chandra-House-Apas-Scheme-Id-Apas012802890014-Under-Ballavpur-Gp-Raniganj-Ps>2026-01-16
-Construction-Of-Pcc-Road-From-Dukhu-Ruidas-House-To-Bamun-Pond-Scheme-Id-Apas/01/280/294/0008-Under-Ballavpur-Gp-Raniganj-Ps>India -Construction-Of-Pcc-Road-From-Dukhu-Ruidas-House-To-Bamun-Pond-Scheme-Id-Apas/01/280/294/0008-Under-Ballavpur-Gp-Raniganj-Ps>103/apas/2025
Construction Of Pcc Road From Dukhu Ruidas House To Bamun Pond Scheme Id Apas/01/280/294/0008 Under Ballavpur Gp Raniganj Ps
-Construction-Of-Pcc-Road-From-Dukhu-Ruidas-House-To-Bamun-Pond-Scheme-Id-Apas/01/280/294/0008-Under-Ballavpur-Gp-Raniganj-Ps>2026-01-16
Whats app