Filter Search


Transportation


Location Summary Deadline
India Const.of C.c Road At Verious Roads Jahangiri School Road , Imambada Road And Shweta Bhojnalay To Manglam Showroom Ward No.21 Z-02 2026-01-19
India Const.of C.c Road At Saifiya College Gate No.1 To Guard Gate Noor Us Sabha Road Ahamdabad Palace Road Ward No.7 Z-02 2026-01-19
India Supply Of Dust Shield Spring For Axle Box Guide Arrgt. To Icf Drg. No. T-0-1-607, Alt. K & 15 [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitted: Max 8 L 2026-01-19
India Supply Of Qrv Kit For Keo Type Dv Containing 15 Items As Per List Attached. [ Warranty Period: 36 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variationpermitted: Max 8 Lacs ] ] 2026-01-19
India Revised Tender Conditions For Stores Supply Contract & Instructions To Tenderers For Submitting E-bids I.e., Central Railway Bid Document Updated Till January 2024. The Documents Include Instructions To Tenderers For Submitting E-bids, Important Terms & C 2026-01-19
India The Principal Chief Materials Manager, South Eastern Railway, Garden Reach, India Invites Electronic Tenders For The Supply As Set Forth In The Notice Inviting Tender (nit) And Tender Document Uploaded On The Indian Railways E Procurement System Website. 2026-01-19
India Inclusion Of Tender Condition Regarding Submission Of Self-certified Undertaking By Bidders In Stores Tenders. The Tenderers Shall Submit A Copy Of Certificate Stating That All Their Statements/documents Submitted Along With Bid Are True And Factual. Non- 2026-01-19
India Revised Tender Conditions For Stores Supply Contract & Instructions To Tenderers For Submitting E-bids I.e., Central Railway Bid Document Updated Till January 2024. The Documents Include Instructions To Tenderers For Submitting E-bids, Important Terms & C 2026-01-19
India Supply Of Sensor Arm With Adjusting Screw For Escorts Design Bmbs As Per Specified Drawings And Operational Manuals. The Delivery Period Is Within 3 Months From The Commencement Date, Which Is Within 1 Day Of The Contract Issue. Sensor Arm With Adjusting 2026-01-19
India The Principal Chief Materials Manager (pcmm), East Coast Railway, Bhubaneswar-751017 On Behalf Of The President Of India Invites E-tenders From Established And Reliable Manufacturers Or Their Authorized Agents For The Supply Of The Items As Set Forth In T 2026-01-19
Whats app