Filter Search


Transportation


Location Summary Deadline
Netherlands Framework Agreement Temporary Traffic Measures 2627 2026-01-19
Singapore The Provision Of Transport Services (cars) To Ministry Of Health (moh) 2026-01-19
Czech Republic Public Contract - Cycle Path Pavlovice Near Kojetín In The Direction Of Vrchoslavice 2026-01-19
Bulgaria Performance Of Public Transport Of Passengers On Established Lines And Timetables For Them By Municipal And Inter-district Transport Schemes - Quota Of The Municipality Of Kirkovo 2026-01-19
India Supply Of Speed Sensor Cable For Wsp With Connector As Per Knorr Bremse Part No.stn 45026. [ Warranty Period: 36 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitted: Max 8 Lacs 2026-01-19
India Supply Of Assembly 160 Kn For Fiat Type Bogie As Per Specn Rdso Str No. Rdso/cg/s/23002, Rev.1, Scope Of Supply Shall Be As Per Clause 4.1 Of Rdso Str No. Rdso/cg/s/23002, Rev 1. [ Warranty Period: 72 Months After The Date Of Delivery ][quantity Tolerance 2026-01-19
-Design,-Engineering,-Fabrication,-Procurement-Of-Materials-And-Bought-out-Components,-Assembly-At-Shop,-Inspection,-Testing-At-Manufacturers-Works,-Site-Work,-Packing-And-Supply-Of-Drinking-Water-Package>India -Design,-Engineering,-Fabrication,-Procurement-Of-Materials-And-Bought-out-Components,-Assembly-At-Shop,-Inspection,-Testing-At-Manufacturers-Works,-Site-Work,-Packing-And-Supply-Of-Drinking-Water-Package>Supply Of Drinking Water Package
Design, Engineering, Fabrication, Procurement Of Materials And Bought-out Components, Assembly At Shop, Inspection, Testing At Manufacturers Works, Site Work, Packing And Supply Of Drinking Water Package
-Design,-Engineering,-Fabrication,-Procurement-Of-Materials-And-Bought-out-Components,-Assembly-At-Shop,-Inspection,-Testing-At-Manufacturers-Works,-Site-Work,-Packing-And-Supply-Of-Drinking-Water-Package>2026-01-19
India Supply Of Side Buffer Recoil Spring Parting Plate (b.g) Irs Drg No.-w/bd 2253, Alt.- 1 [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitted: Max 8 Lacs ] ] 2026-01-19
-Repairing-Of-Road-At-Deshapara-Teler-Par-Near-Lalmohan-Das-House-To-12-No-Road-At-Nasibpur-Gp-Within-Singur-Dev-Block.>India -Repairing-Of-Road-At-Deshapara-Teler-Par-Near-Lalmohan-Das-House-To-12-No-Road-At-Nasibpur-Gp-Within-Singur-Dev-Block.>Memo 4774 Sl 12
Repairing Of Road At Deshapara Teler Par Near Lalmohan Das House To 12 No Road At Nasibpur Gp Within Singur Dev Block.
-Repairing-Of-Road-At-Deshapara-Teler-Par-Near-Lalmohan-Das-House-To-12-No-Road-At-Nasibpur-Gp-Within-Singur-Dev-Block.>2026-01-19
-Repairing-Road-Near-Malikpara-Sripati-Malik-House-To-Jadob-Malik-House,-Ashok-Das-House-To-Manajit-Malik-House,-Chandicharan-Das-Garden-To-Sukumar-Das-Houseat-Nasibpur-Gp-Within-Singur-Dev-Block.>India -Repairing-Road-Near-Malikpara-Sripati-Malik-House-To-Jadob-Malik-House,-Ashok-Das-House-To-Manajit-Malik-House,-Chandicharan-Das-Garden-To-Sukumar-Das-Houseat-Nasibpur-Gp-Within-Singur-Dev-Block.>Memo 4774 Sl 18
Repairing Road Near Malikpara Sripati Malik House To Jadob Malik House, Ashok Das House To Manajit Malik House, Chandicharan Das Garden To Sukumar Das Houseat Nasibpur Gp Within Singur Dev Block.
-Repairing-Road-Near-Malikpara-Sripati-Malik-House-To-Jadob-Malik-House,-Ashok-Das-House-To-Manajit-Malik-House,-Chandicharan-Das-Garden-To-Sukumar-Das-Houseat-Nasibpur-Gp-Within-Singur-Dev-Block.>2026-01-19
Whats app