Filter Search


Transportation


Location Summary Deadline
India Procurement Of Matched Set Of V Belt Etc... .#* Matched Set Of 12 Nos V Belt For Railway Coaches Size: C-122 Conforming T o Rdso Specification. No. Rdso/pe/spec/ac/0059-2004 (rev-1) & I) Maximum Permissible Ash content Of 5% As Per Is 3400 Part 22. Ii) 2025-10-08
India 1. Tool Holder Ptgn L 3232 P 22 For Cnc Vtl Machine Make- Widia/taegutec/ Turbulent or Similar. 2.set Of Spare Part For Tool Holder Ptgn L 3232 P 22, One Set Consist Of Six Items (each Item Qty -1 No). I) Insert Shim Widia Ord. No.- 214 85 620/ Taegutec O 2025-10-08
India 1/4inch Drive Ratchet 1. Should Have Cushioned Soft Grip 2. Flexible Head 3. Length Of Tool 180 Mm To 210 Mm 4. Chrome Finish 5. Swing Arc Of Max 5 Degrees 6. Sealed Head Should include Metric Hex Bit Socket Of Size 5-15 Mm And Metric Hex Bit Deep Sockets 2025-10-08
India 1/2inch Drive Ratchet 1. Should Have Cushioned Soft Grip 2. Length Of Tool 415 Mm To 430 mm 3. Chrome Finish 4. Should Include A Locking Mechanism Repair Kit 5. Swing Arc Of Max 5 degrees 6. Sealed Head Make Snap On, Bahco, Williams. .#* 1/2inch Drive Rat 2025-10-08
India Square Stud Mount Hrc Fuse 500a/ 1250v .#* Square Stud Mount Hrc Fuse 500a/ 1250v Of M/s. Ferraz Shawmut Make Part No. C72ud13c500d1a Or M/ s. Protistor Make Part No. V300559 Or M/s. Bussman Make Part No. 170m4246 Or M/s. Hirect Make Part No. 5202242450, 2025-10-08
India Bell Crank Lever- Lh Assy Escorts Drg. No. 3eb9792 Alt Latest. Make/ Brand- escorts .#* Bell Crank Lever- Lh Assy Escorts Drg. No. 3eb9792 Alt Latest. Make/ Brand-escorts [ warranty Period: 30 Months After The Date Of Delivery ] ] 2025-10-08
India Wodden Wedges For Bg Rolling Stock To C. [wodden Wedges For Bg Rolling Stock To C. Rly. Drg. No. F(c&w):1608,alt-3, Item no.1 & 3 As Per Drawing Attached Requirement Quantity Of 50% Wooden Wedge For Coaching Mainline & 50% For Bg wagons.] .#* Wodden Wedge 2025-10-08
India Tecspak Pad Of Side Bearer Of Blc Wagon .#* Tecspak Pad Of Side Bearer Of Blc Wagon As Per Drg. No.40704 And Spec. No. Contr-01 Mi sc 2007 Rev.01 Amnd. 01 Jan 2022 [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2025-10-08
India Control Office Equipments (coe) .#* Supply, Installation And Commissioning Of Control Office Equipments (coe) For data Retrieval And Analytics Sytem For Three Phase Electric Locomotives As Per Part 3 Of Cl w Spec No. Clw/c-d&d/es/3/0554 Issued In April 20 2025-10-08
India Zone-b1(a)-works And Pway-tpj: Zonal Piece Work Contract - Execution Of Civil engineering Works And Supply Of Materials Including Reinforcement Steel In permanent Way Section And Works Section/tiruchchirappalli (kallukuzhi, Crawford colony, Tpgy, Tp, Offi 2025-10-08
Whats app