Filter Search


Transportation


Location Summary Deadline
India Selection Of System Integrator For Implementation And Operation & Maintenance Of Bharatnet Phase-ii Project In The State Of Chhattisgarh (package-b). The Selected System Integrator (si) Will Be Responsible For The Implementation Of Ofc Connectivity Includ 2026-01-15
India Construction Of Approach Road To Bridge Connecting Hadinaru And Saraguru Villages Across Kabini River In Varuna Constituency Mysore District 2026-01-15
India The Tender Is For The Supply Of Items As Set Forth In The ''''schedule Of Requirements'''' For North Western Railway. The Tenderers Must Comply With The Instructions, General And Special Conditions Of The Tender, And Irs Conditions Of Contract. The Tender 2026-01-15
India The Tender Is For The Supply Of Items As Set Forth In The ''''schedule Of Requirements'''' For North Western Railway. The Tenderers Must Comply With The Instructions, General And Special Conditions Of The Tender, And Irs Conditions Of Contract. The Tender 2026-01-15
India This Document Outlines The Revised Indian Railway Standard (irs) Conditions Of Contract, September 2022 Version 1.0, For Implementation In Future Procurements. It Includes Definitions, Interpretations, And Various Clauses Related To The Acceptance Of Tend 2026-01-15
India Revised Tender Conditions For Stores Supply Contract & Instructions To Tenderers For Submitting E-bids I.e., Central Railway Bid Document Updated Till January 2024. The Following Documents As Contained In ''''central Railway Bid Document – Updated Till Ja 2026-01-15
India Manufacture & Supply Of 1-in-12 Weldable Cast Manganese Steel Crossing B.g. For 60e1rail Section And R260 Grade On Psc Sleepers In Accordance With Rdso's Standard Drawing No. T-6412( Alt.6) & T-8781 (alt. 3) Includingsupply Of 6mm Thick Nylon Chord Reinfo 2026-01-15
Algeria Supply Of Insulating Products For Bi-block Sleepers, For The Execution Of The Integrated System Of The Algiers Metro Line Extension Project, El Harrach – Airport Section, Divided Into Four (4) Lots: lot No. 01: Elastic Rail Pad. lot No. 02: 1- Anti-vibrat 2026-01-15
India Bracket Complete For Equalising Stay .#* Bracket Complete For Equalising Stay On Bogie Bolster. Drawing No.:- Wlrrm-0-4-002 alt (d) & ( 9 ) Item- 1, 3 & 4 ( As Per Col. 3 ) [ Warranty Period: 30 Months After The Date Of Delivery ] [quantity Tolerance (+/- 2026-01-15
Germany Welding Monitoring For Track Construction Measures 2026-01-15
Whats app