Filter Search


Transportation


Location Summary Deadline
India 1.electrical Portion Of The Work "provision Of Cctv And Centralized Monitoring system For Monitoring Freight Activity Over Bsp Division. 2. Electrical Portion Of The work " Provision Of Foot Over Bridge At Bhtk Railway Station. 2026-01-12
-Repairing-Of-Road-And-Construction-Of-Drain-With-Slab-At-Kabi-Mukunda-Das-Road-In-Ward-No--02-(part-No--111)>India -Repairing-Of-Road-And-Construction-Of-Drain-With-Slab-At-Kabi-Mukunda-Das-Road-In-Ward-No--02-(part-No--111)>Wbmad/ulb/sddm/nit759/12/25sl1
Repairing Of Road And Construction Of Drain With Slab At Kabi Mukunda Das Road In Ward No- 02 (part No- 111)
-Repairing-Of-Road-And-Construction-Of-Drain-With-Slab-At-Kabi-Mukunda-Das-Road-In-Ward-No--02-(part-No--111)>2026-01-12
-Construction-Of-C.c-Road-And-Cover-Slab-At-Chowdhury-Bagan>India -Construction-Of-C.c-Road-And-Cover-Slab-At-Chowdhury-Bagan>Wbmad/ulb/sddm/nit745/12/25sl2
Construction Of C.c Road And Cover Slab At Chowdhury Bagan
-Construction-Of-C.c-Road-And-Cover-Slab-At-Chowdhury-Bagan>2026-01-12
India Multiple Ring Set .#* Multiple Ring Set Of Fey Lamellenringe-gmbh To Part No 00009468, Type Fk 4-is. Size 560.0 /584.0x6.5mm(1 Set Consists 3 Nos X 1.5mm +1 No X 1.7mm Thick). Material: Din 1.1221 And 1.8159 Note:1 ) Warranty: The Material Shal Have A War 2026-01-12
-P>India -P>New Connectivity Of Road From1. L412-jadhu Bahadur Para To Ganga Prasad Para, L- 3.45 Km, Package No-tr0640p4, 2. L411-at Road- Jadav Para Road To Rangjuha, L- 6.75km, Package No-tr0641p4, 3.l413-talbangha To Kathirai Para, L- 1.027 Km, Package No
P
-P>2026-01-12
>India >New Connectivity Of Road From 1. L424-mailak Gatiram Road To Bivaram Para, L- 1.288 Km, Package No. Tr-06-32p4, 2. L420-at Road-atambhagya Road At Kasko To Balyaram Para (new), L- 4.375 Km , Package No. Tr-06-33p4, 3. L422- Amarpur-gandacherra To Sa
>2026-01-12
-Recovery-And-Restoration-Of-Fului-Rangamati-Via-Tarajuli-Khal-Ghat-Road-From-Ch.0.00kmp-To-14.50km-(except-Causeway-At-2.40-Km),-Surfacing-Work-Under-Hhd-i,-P.w(r).dte-For-Mending-Up-Damages-Occurred-Due-To-Heavy-Rainfal>India -Recovery-And-Restoration-Of-Fului-Rangamati-Via-Tarajuli-Khal-Ghat-Road-From-Ch.0.00kmp-To-14.50km-(except-Causeway-At-2.40-Km),-Surfacing-Work-Under-Hhd-i,-P.w(r).dte-For-Mending-Up-Damages-Occurred-Due-To-Heavy-Rainfal>Wbpwrd/se/whc-ii/nit_21/sl_3
Recovery And Restoration Of Fului Rangamati Via Tarajuli Khal Ghat Road From Ch.0.00kmp To 14.50km (except Causeway At 2.40 Km), Surfacing Work Under Hhd-i, P.w(r).dte For Mending Up Damages Occurred Due To Heavy Rainfal
-Recovery-And-Restoration-Of-Fului-Rangamati-Via-Tarajuli-Khal-Ghat-Road-From-Ch.0.00kmp-To-14.50km-(except-Causeway-At-2.40-Km),-Surfacing-Work-Under-Hhd-i,-P.w(r).dte-For-Mending-Up-Damages-Occurred-Due-To-Heavy-Rainfal>2026-01-12
-Pmgsy-Road>India -Pmgsy-Road>New Connectivity Of Road From L520-nh8 To Kalamjoy Para, L-1.47 Km, Package No-tr0505 P4 Under Pecharthal Block.
Pmgsy Road
-Pmgsy-Road>2026-01-12
-Emergent-Repairing-Or-Maintenance-Of-Damaged-Road-Surface-Of-Mathura-Bakultala-Vikdas-Road-In-Between-Ch.-1.20-Km.-To-1.75-Km.,-Ch.-2.10-Km.-To-2.70-Km.,-Ch.-3.40-Km.-To-3.95-Km.,-Ch.-4.55-Km.-To-5.10-Km.,-Ch.-5.85-Km.-To>India -Emergent-Repairing-Or-Maintenance-Of-Damaged-Road-Surface-Of-Mathura-Bakultala-Vikdas-Road-In-Between-Ch.-1.20-Km.-To-1.75-Km.,-Ch.-2.10-Km.-To-2.70-Km.,-Ch.-3.40-Km.-To-3.95-Km.,-Ch.-4.55-Km.-To-5.10-Km.,-Ch.-5.85-Km.-To>Wbpwd/ee/nit-10/25-26/sl-1
Emergent Repairing Or Maintenance Of Damaged Road Surface Of Mathura Bakultala Vikdas Road In Between Ch. 1.20 Km. To 1.75 Km., Ch. 2.10 Km. To 2.70 Km., Ch. 3.40 Km. To 3.95 Km., Ch. 4.55 Km. To 5.10 Km., Ch. 5.85 Km. To
-Emergent-Repairing-Or-Maintenance-Of-Damaged-Road-Surface-Of-Mathura-Bakultala-Vikdas-Road-In-Between-Ch.-1.20-Km.-To-1.75-Km.,-Ch.-2.10-Km.-To-2.70-Km.,-Ch.-3.40-Km.-To-3.95-Km.,-Ch.-4.55-Km.-To-5.10-Km.,-Ch.-5.85-Km.-To>2026-01-12
-Emergent-Repairing-Or-Maintenance-Of-Damaged-Road-Surface-Of-Khandighi-Anur-Road-In-Between-Ch.-0.20-Km.-To-0.80-Km.,-Ch.-1.15-Km.-To-1.75-Km.,-Ch.-2.10-Km.-To-2.75-Km.,-Ch.-3.15-Km.-To-3.85-Km.-(in-Stretches-Effectively-2>India -Emergent-Repairing-Or-Maintenance-Of-Damaged-Road-Surface-Of-Khandighi-Anur-Road-In-Between-Ch.-0.20-Km.-To-0.80-Km.,-Ch.-1.15-Km.-To-1.75-Km.,-Ch.-2.10-Km.-To-2.75-Km.,-Ch.-3.15-Km.-To-3.85-Km.-(in-Stretches-Effectively-2>Wbpwd/ee/nit-10/25-26/sl-2
Emergent Repairing Or Maintenance Of Damaged Road Surface Of Khandighi Anur Road In Between Ch. 0.20 Km. To 0.80 Km., Ch. 1.15 Km. To 1.75 Km., Ch. 2.10 Km. To 2.75 Km., Ch. 3.15 Km. To 3.85 Km. (in Stretches Effectively 2
-Emergent-Repairing-Or-Maintenance-Of-Damaged-Road-Surface-Of-Khandighi-Anur-Road-In-Between-Ch.-0.20-Km.-To-0.80-Km.,-Ch.-1.15-Km.-To-1.75-Km.,-Ch.-2.10-Km.-To-2.75-Km.,-Ch.-3.15-Km.-To-3.85-Km.-(in-Stretches-Effectively-2>2026-01-12
Whats app