Filter Search


Transportation


Location Summary Deadline
India Roller Bearing Axle Boxes Complete. .#* Roller Bearing Axle Boxes Complete (plain End Cover) As Per Rdso Drg.no.skvl-603 Alt- 7 Or Latest And Specn.no.mp.0.3600.01 To M/s. Nei Drg.no.92-4271c Mod V.or M/s. Fag Drg No-edd 901-02-101 000, Ver.aa For Without 2026-01-12
India Handle For Centre Brake Rigging For Boxn Wagon To Irs Drg. No. W/bg6192a, alt.3. .#* Handle For Centre Brake Rigging For Boxn Wagon To Irs Drg. No. W/bg6192a, Alt.3. [ W arranty Period: 30 Months After The Date Of Delivery ] [quantity Tolerance (+/-): 5 % 2026-01-12
India Brake Gear Arrangement And Details Without Air Brake Cylinder For Wag-9hc locomotives. .#* Brake Gear Arrangement And Details Without Air Brake Cylinder For Wag-9hc Locomotiv es. As Per Drg.no. 1209-01.116-059 Alt-5 [ Warranty Period: 30 Months After The 2026-01-12
India Dbr (vertical) Fitted With Ac Mvrf For Electric Locos .#* Dbr (vertical) Fitted With Ac Mvrf For Electric Locos As Per Rdso Spec.no. Elrs/spec/dbr/0028 Rev.0 O f Sept-2003 With Amendment No. 1, 2 And 3. [ Warranty Period: 30 Months After The Date Of Deliv 2026-01-12
India Construction Of Cc Road Near Hope Hospital Azad Nagar W-64 Z-15. 2026-01-12
India 6400 Mm Over Riding Derailing Switches 1 In 8.5, T/out For Bg (1673 Mm) 60kg On psc Sleepers To Rdso Drg. No. T-6068 .#* Manufacture & Supply Of 6400 Mm Over Riding Derailing Switches 1 In 8.5, T/out For Bg ( 1673 Mm) 60kg On Psc Sleepers To Rdso Drg. No. 2026-01-12
India Main Compressor .#* Main Compressor 1750 Lpm Each Onboard Mounting Type With Motor (wound With Corona Resista nce Wire) And Mounting Accessories For Used In Locomotives As Per Following Specifications: (i) Main Compresso r: Rdso Specification No. Rdso/201 2026-01-12
India Engine - Anti Vibration Mounting Pad .#* Engine - Anti Vibration Mounting Pad To Cummins Part No: 3226031 Or Latest/resistoflex Part No: Rm-fm/500s/60c/cs Suitable to Cummins Diesel Engines ; Make: Cummins/resistoflex/dunlop/psa/bt Or Its Equivalent. [ Wa 2026-01-12
India Asphalting Of Roads At Various Locations Of Zone 12 And Zone 09 2026-01-12
-Recovery-And-Restoration-Work-Of-Tutapakri-To-Garalbari-Road-From-0.30-Km-To-5.20-Km-Under-Jalpaiguri-Highway-Division-In-The-District-Of-Jalpaigur-For-Mending-Up-Damages-Occurred-Due-To-Heavy-Rainfall-/-Flood-Like-Situation.>India -Recovery-And-Restoration-Work-Of-Tutapakri-To-Garalbari-Road-From-0.30-Km-To-5.20-Km-Under-Jalpaiguri-Highway-Division-In-The-District-Of-Jalpaigur-For-Mending-Up-Damages-Occurred-Due-To-Heavy-Rainfall-/-Flood-Like-Situation.>Road Works
Recovery And Restoration Work Of Tutapakri To Garalbari Road From 0.30 Km To 5.20 Km Under Jalpaiguri Highway Division In The District Of Jalpaigur For Mending Up Damages Occurred Due To Heavy Rainfall / Flood Like Situation.
-Recovery-And-Restoration-Work-Of-Tutapakri-To-Garalbari-Road-From-0.30-Km-To-5.20-Km-Under-Jalpaiguri-Highway-Division-In-The-District-Of-Jalpaigur-For-Mending-Up-Damages-Occurred-Due-To-Heavy-Rainfall-/-Flood-Like-Situation.>2026-01-12
Whats app