Filter Search


Transportation


Location Summary Deadline
India Supply Of Coach Set Layout Notices For .#* Supply Of Coach Set Layout Notices For Ss2 Vande Bharat Train Set (tc To Drg. Ts/mc-6- 4-001, Alt-nil, Col-3 (except Items - 15, 21 & 29), Mc To Drg. Ts/mc-6-4-001, Alt-nil, Col-2(exce pt Items - 15, 21 & 29), Dt 2025-11-18
India Centre Stiffener For Head Stock To Icf Drg. No. T-1-2-513, Alt. N/30, Item no. 2 [seamless Tube] .#* Centre Stiffener For Head Stock To Icf Drg. No. T-1-2-513, Alt. N/30, Item No. 2 [seamless Tube] [ Warranty Period: 30 Months After The Date Of Delivery ] 2025-11-18
India Pressed Body Side Pannel For Icf Coaches, Type-vii Size : 1800 X 650 X 2 Mm, As per Jt/sk-3349, Alt. Nil, Item No. 7 [length Of Straight Portion Is 575 Mm]. Material and Specification As Per Drawing. .#* Pressed Body Side Pannel For Icf Coaches, Type-vii 2025-11-18
India Tender Invited For Long Service Medal For 25 Yrs Completion Silver Medal Badge With Tag##quantity: 462## 2025-11-18
India Construction Of Road Pride City To Bypass Road Length 3.00 K.m. Pac 1227.84 Lacs First Call On Road And Bridge S.o.r. Wef 11-04-25 Work Period 365 Days I/c Rainy Season 2025-11-18
India Construction Of Road From Arvind Vihar Colony Road, Bhopal . (length 9.010 Km.) Pac 2452.94 Lacs First Call On Road And Bridge S.o.r. Wef 11-04-25 Work Period 180 Days I/c Rainy Season 2025-11-18
India Construction Of Road From Arvind Vihar Setu To Bagmugaliya Extension Road Colony Road, Bhopal (length 5.270 Km.) Pac 1185.21 Lacs First Call On Road And Bridge S.o.r. Wef 11-04-25 Work Period 150 Days I/c Rainy Season 2025-11-18
India Strengthening Of Road From Gulmohar Canal To Indus Centre Point (near Akriti Eco City) Road - Length 2.40 Km. .) Pac 951.72 Lacs First Call On Road And Bridge S.o.r. Wef 11-04-25 Work Period 180 Days I/c Rainy Season 2025-11-18
India Construction Of Road From Bagsewaniya Thana To Hdfc Via Bagmugaliya Road Length 1.60 Km. Pac 857.51 Lacs First Call On Road And Bridge S.o.r. Wef 11-04-25 Work Period 300 Days I/c Rainy Season 2025-11-18
India Strengthening Of Road From Jubli Gate (b.h.e.l.) To Ayodhya Bypass Road ( Service Lane Road) Length 2.30 Km. Pac 538.83 Lacs First Call On Road And Bridge S.o.r. Wef 11-04-25 Work Period 300 Days I/c Rainy Season 2025-11-18
Whats app