Filter Search


Transportation


Location Summary Deadline
-Construction-Of-Concrete-Road-From-Sk-Nuruddin-House-To-Sajal-Roy-House-At-Karalda-Naherabar.apas/01/216/46/0007>India -Construction-Of-Concrete-Road-From-Sk-Nuruddin-House-To-Sajal-Roy-House-At-Karalda-Naherabar.apas/01/216/46/0007>Nit20/2025-26/contai-iii Block/14
Construction Of Concrete Road From Sk Nuruddin House To Sajal Roy House At Karalda Naherabar.apas/01/216/46/0007
-Construction-Of-Concrete-Road-From-Sk-Nuruddin-House-To-Sajal-Roy-House-At-Karalda-Naherabar.apas/01/216/46/0007>2025-12-10
India Secondary Vertical Damper For Lhb Nac Coaches. .#* Aluminium Comb For Tm Filter Drg. No. Emu/e3/sk/121/13, Item No. 12. [ Warranty Per iod: 30 Months After The Date Of Delivery ] [quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value 2025-12-10
India Resin Bond Disc .#* Resin Bond Disc 10" (254 Mm), Flexible Magnetic Backing, Grit 1200, As Per Annexure A [ Warranty Period: 30 Months After The Date Of Delivery ] [quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permi 2025-12-10
India Set Of Panels For Lhb Eog Non Ac Coaches. .#* Supply, Testing And Commissioning (including All Connection & Dressing Without Loading ) Of Set Of Panels For Lhb Eog Non Ac Coaches As Per Specification No. Edts-355, Rev-1, Am-1 To 6 [w ithout Item S.n. 8 (l 2025-12-10
-Construction-Of-Concrete-Road-From-Sujay-Bar-House-To-Sadananda-Bar-House-At-Akandiapas/01/216/47/0011>India -Construction-Of-Concrete-Road-From-Sujay-Bar-House-To-Sadananda-Bar-House-At-Akandiapas/01/216/47/0011>Nit20/2025-26/contai-iii Block/17
Construction Of Concrete Road From Sujay Bar House To Sadananda Bar House At Akandiapas/01/216/47/0011
-Construction-Of-Concrete-Road-From-Sujay-Bar-House-To-Sadananda-Bar-House-At-Akandiapas/01/216/47/0011>2025-12-10
-Road-Repairing-From-Zilla-Parishad-Road-To-Bhabasindhu-Biswas-At-Part-12/18-Salkumar-ii-G.p-Within-Alipurduar-i-Development-Block>India -Road-Repairing-From-Zilla-Parishad-Road-To-Bhabasindhu-Biswas-At-Part-12/18-Salkumar-ii-G.p-Within-Alipurduar-i-Development-Block>Wb/apd-i/bdo-et/08/2025-26
Road Repairing From Zilla Parishad Road To Bhabasindhu Biswas At Part 12/18 Salkumar-ii G.p Within Alipurduar-i Development Block
-Road-Repairing-From-Zilla-Parishad-Road-To-Bhabasindhu-Biswas-At-Part-12/18-Salkumar-ii-G.p-Within-Alipurduar-i-Development-Block>2025-12-10
-Road-Repair-Pwd-Road-To-Mitali-Sarkar-House-At-Part-12/18-Salkumar-ii-G.p-Within-Alipurduar-i-Development-Block>India -Road-Repair-Pwd-Road-To-Mitali-Sarkar-House-At-Part-12/18-Salkumar-ii-G.p-Within-Alipurduar-i-Development-Block>Wb/apd-i/bdo-et/08/2025-26
Road Repair Pwd Road To Mitali Sarkar House At Part 12/18 Salkumar-ii G.p Within Alipurduar-i Development Block
-Road-Repair-Pwd-Road-To-Mitali-Sarkar-House-At-Part-12/18-Salkumar-ii-G.p-Within-Alipurduar-i-Development-Block>2025-12-10
India Bogie Frame Complete Machined For Train18,emu/us & Memu/us coaches .#* Bogie Frame Complete Machined For Train18,emu/us & Memu/us Coaches To D rg No.72703001/col.i, Alt E. Special Condition : Suitable Packing To Be Done To Avoid Damag e During Transit & U 2025-12-10
India Constuction Of Cc Road From Ho Sikha Roy To Ho Madhab Das At Srikrishna Nagar Part No 102-195 Kashimpur Gp , Id No. Apas-01-102-195-0004 2025-12-10
-Basic-Transit-Related-Infrastrrcture-To-Improve-From-Z.p-Road-To-House-Of-Khageswar-Ray-At-12/21-Salkumar-ii-G.p-Within-Alipurduar-i-Development-Block>India -Basic-Transit-Related-Infrastrrcture-To-Improve-From-Z.p-Road-To-House-Of-Khageswar-Ray-At-12/21-Salkumar-ii-G.p-Within-Alipurduar-i-Development-Block>Wb/apd-i/bdo-et/08/2025-26
Basic Transit Related Infrastrrcture To Improve From Z.p Road To House Of Khageswar Ray At 12/21 Salkumar-ii G.p Within Alipurduar-i Development Block
-Basic-Transit-Related-Infrastrrcture-To-Improve-From-Z.p-Road-To-House-Of-Khageswar-Ray-At-12/21-Salkumar-ii-G.p-Within-Alipurduar-i-Development-Block>2025-12-10
Whats app