Filter Search


Transportation


Location Summary Deadline
India Construction Of Concrete Road From House Of Mabud Chowduary To House Of Yousup Sekh (purbapara) Under Satgachia -ii Gp Within Memari-ii Ps. Activity Id.- Apas/01/265/52/0006, Booth No.- 52/ Dt.- 30/10/2025 2025-12-23
India Construction Of Concrete Road From Durga Mandir To Jogeswar Harijan House, Booth No.-294, Ward No.-43, Under D.m.c. Area 2025-12-23
United Kingdom Oral Health Promotion - 422-nyc-ha 2025-12-23
-Traffic-Calming-Measure-Of-Roads-Under-Manikchak-And-Ratua-I-Blocks-In-The-District-Of-Malda-Total-Length-54.45-Km>India -Traffic-Calming-Measure-Of-Roads-Under-Manikchak-And-Ratua-I-Blocks-In-The-District-Of-Malda-Total-Length-54.45-Km>Nit No 10/ Wbsrda/ Malda/2025-26 Sl-2
Traffic Calming Measure Of Roads Under Manikchak And Ratua I Blocks In The District Of Malda Total Length 54.45 Km
-Traffic-Calming-Measure-Of-Roads-Under-Manikchak-And-Ratua-I-Blocks-In-The-District-Of-Malda-Total-Length-54.45-Km>2025-12-23
-Development-Junctions-Of-Roads-Under-English-Bazer,-Gazole-And-Old-Malda-Blocks-In-The-District-Of-Malda-Total-Length-79.42-Km>India -Development-Junctions-Of-Roads-Under-English-Bazer,-Gazole-And-Old-Malda-Blocks-In-The-District-Of-Malda-Total-Length-79.42-Km>Nit No 11/ Wbsrda/ Malda/2025-26 Sl-2
Development Junctions Of Roads Under English Bazer, Gazole And Old Malda Blocks In The District Of Malda Total Length 79.42 Km
-Development-Junctions-Of-Roads-Under-English-Bazer,-Gazole-And-Old-Malda-Blocks-In-The-District-Of-Malda-Total-Length-79.42-Km>2025-12-23
-Construction-Of-Cc-Road-From-Badal-Giri-To-Prabir-Bhunia(apas/01/131/100/0002)>India -Construction-Of-Cc-Road-From-Badal-Giri-To-Prabir-Bhunia(apas/01/131/100/0002)>Nit168, Sl No-02 At Sri Sri Ramkrishna Gp
Construction Of Cc Road From Badal Giri To Prabir Bhunia(apas/01/131/100/0002)
-Construction-Of-Cc-Road-From-Badal-Giri-To-Prabir-Bhunia(apas/01/131/100/0002)>2025-12-23
-Repairing,-Patch/doubling-Works-Of-Bottom-And-Slanting-Side-Plates,-G.c.i.-Sheet-Works,-Fencing-Works-Etc.-And-Blocking-And-Painting-Works-Of-Twin-Hull-Type-Steel-Barge-At-Illiouspur-Rli-Scheme-(raghunathganj->India -Repairing,-Patch/doubling-Works-Of-Bottom-And-Slanting-Side-Plates,-G.c.i.-Sheet-Works,-Fencing-Works-Etc.-And-Blocking-And-Painting-Works-Of-Twin-Hull-Type-Steel-Barge-At-Illiouspur-Rli-Scheme-(raghunathganj->Ee(am)/ber-i/enit-08/2025-26 (2nd Call)
Repairing, Patch/doubling Works Of Bottom And Slanting Side Plates, G.c.i. Sheet Works, Fencing Works Etc. And Blocking And Painting Works Of Twin Hull Type Steel Barge At Illiouspur Rli Scheme (raghunathganj-
-Repairing,-Patch/doubling-Works-Of-Bottom-And-Slanting-Side-Plates,-G.c.i.-Sheet-Works,-Fencing-Works-Etc.-And-Blocking-And-Painting-Works-Of-Twin-Hull-Type-Steel-Barge-At-Illiouspur-Rli-Scheme-(raghunathganj->2025-12-23
-Construction-Of-Cc-Road-With-Drain-From-H/o-Saidul-Islam-To-Tasir-Sekh(apas/01/131/106/0001)>India -Construction-Of-Cc-Road-With-Drain-From-H/o-Saidul-Islam-To-Tasir-Sekh(apas/01/131/106/0001)>Nit174, Sl No-01 At Sri Sri Ramkrishna Gp
Construction Of Cc Road With Drain From H/o Saidul Islam To Tasir Sekh(apas/01/131/106/0001)
-Construction-Of-Cc-Road-With-Drain-From-H/o-Saidul-Islam-To-Tasir-Sekh(apas/01/131/106/0001)>2025-12-23
India Construction Of Cc Road From H/o Sunil Sarkar To H/o Anil Sarkar At Sonakur. Proposed By Anil Sakar 9832440091. 2025-12-23
-Recovery-And-Reconstruction-Work-To-The-Gurung-Basti-Gulma-Station-Road-From-3.0-Kmp-To-9.91-Km-By-Surfacing-Work-Under-Nbcd,-Pwd-In-The-Dis-Of-Darjeeling-For-Mending-Up-Damages-Occurred-Due-To-Heavy-Rain-Fall-During-The>India -Recovery-And-Reconstruction-Work-To-The-Gurung-Basti-Gulma-Station-Road-From-3.0-Kmp-To-9.91-Km-By-Surfacing-Work-Under-Nbcd,-Pwd-In-The-Dis-Of-Darjeeling-For-Mending-Up-Damages-Occurred-Due-To-Heavy-Rain-Fall-During-The>Wbpwd/se/nbccii/nit23/25-26
Recovery And Reconstruction Work To The Gurung Basti Gulma Station Road From 3.0 Kmp To 9.91 Km By Surfacing Work Under Nbcd, Pwd In The Dis Of Darjeeling For Mending Up Damages Occurred Due To Heavy Rain Fall During The
-Recovery-And-Reconstruction-Work-To-The-Gurung-Basti-Gulma-Station-Road-From-3.0-Kmp-To-9.91-Km-By-Surfacing-Work-Under-Nbcd,-Pwd-In-The-Dis-Of-Darjeeling-For-Mending-Up-Damages-Occurred-Due-To-Heavy-Rain-Fall-During-The>2025-12-23
Whats app