Filter Search


Transportation


Location Summary Deadline
India Construction Of Project Road Sh-65 At Damangadia To Kharod Mahakali Via Gopalpur From 0/000 Km To 7/920 Km Under Badamba Block In The District Of Cuttack 2025-11-17
India Hopper Door Pinion (bg) .#* Hopper Door Pinion (bg) For Bobyn Wagon To I.r.s Drawing No.-w/dw-201,alt-1 Or Latest. [ warranty Period: 30 Months After The Date Of Delivery ] ] 2025-11-17
India Tie Coat As Per Rdso Spec. No. M&c/pcn/114/2020 (tie Coat Should Be Water Based As Per the Above Specification). Packaging Should Be In 20 L Container. Colour Shade-white. .#* Ttie Coat As Per Rdso Spec. No. M&c/pcn/114/2020 (tie Coat Should Be Water Base 2025-11-17
India [supply,installation And Commissioning Of Motorized Hydraulic System For Vertical compression And Horizontal Pushing Of Oval Rubber Springs And Plates Into And Out Of yoke Of Shacku Coupler] .#* Supply,installation And Commissioning Of Motorized Hydraulic 2025-11-17
India Hydraulic System For Pinion Mounting & Extraction .#* Hydraulic System For Pinion Mounting & Extraction As Per Specification No. Plw/m/tms/m&p/2 5-26/pmde [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2025-11-17
India Rubber Bump Stopper For Axle Box Crown .#* Rubber Bump Stopper For Axle Box Crown To Rdso Drg. No. Sk-97068 Alt-4, Item No. 1. Matl .&spec. As Per Drg. [ Warranty Period: 30 Months After The Date Of Delivery ] [quantity Tolerance (+/-): 5 %age , Item Cate 2025-11-17
-Construction-Of-Cc-Road-From-H/o-Manowar-Hossain-Towards-Jora-Transformer-At-Sansad-No-I-Within-Boxiganj-Gp-Under-Haldibari-Development-Block-Cooch-Behar-District.-Apas/01/001/99/0006>India -Construction-Of-Cc-Road-From-H/o-Manowar-Hossain-Towards-Jora-Transformer-At-Sansad-No-I-Within-Boxiganj-Gp-Under-Haldibari-Development-Block-Cooch-Behar-District.-Apas/01/001/99/0006>Cc Road
Construction Of Cc Road From H/o Manowar Hossain Towards Jora Transformer At Sansad No I Within Boxiganj Gp Under Haldibari Development Block Cooch Behar District. Apas/01/001/99/0006
-Construction-Of-Cc-Road-From-H/o-Manowar-Hossain-Towards-Jora-Transformer-At-Sansad-No-I-Within-Boxiganj-Gp-Under-Haldibari-Development-Block-Cooch-Behar-District.-Apas/01/001/99/0006>2025-11-17
India Repairs Of Ballastless Track Under Traffic In Natuwadi, Karbude, Tike, Berdewadi tunnels In Ratnagiri Region. (rate Quoted Shall Be Excluding Gst. Gst Shall Be payable Extra As Applicable). Computer No.65871 2025-11-17
India Supply Of Galvanized Portals & Ttc With Boom Etc. R.i Number Of The Material Description And quantity Of The Materials As Per Attached Annexure. And Specification No: Is 2062 , Is 808. minimum Zinc Coating Thickness Should Be 610 Gm/sq Mtr Or 86 Microns A 2025-11-17
India Cc Roads, (1) Construction Of Cc Road From The House Of Sirajul Haque To Masjid At Sansad No Iii Within Boxiganj Gp Under Haldibari Development Block Coochbehar District Apas/01/001/101/0008 (2) Construction Of Cc Road From The House Of Chitra Sarkar To T 2025-11-17
Whats app