Filter Search


Transportation


Location Summary Deadline
Peru National Land Cargo Transport Service - Transport Service For Seized Or Confiscated Goods And Others, For The Mass Actions Section Of The National Customs Control Office 2024-10-21
France Development Of A Traffic Light Intersection Rd10xrd406 Commune Of Jossigny 2024-10-21
India Supply Of Ioh Kit For Pantograph Type Cpl Ir-03h Consisting Of 15 Items Of M/s Contransys (68 Sub Items &126 In Nos) As Per Rdso Smi No. Rdso/2016/el/smi/0292 Rev. 0 Dated 27.06.2016. [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tole 2024-10-21
India Supply Of Set Of Single Duct Leather Bellow For Traction Motor 6fra6068 Of Wap7/wag9 Electric Locomotives As Per Clw Drg. No. 1209-01-018.029 Alt-2 Or Latest And As Per Rdso Spec No. Spec/e-7/06(rev.2) Of July-2002, Consisting Of (i) 02 Nos. Of Type-i Lea 2024-10-21
India Supplying Of Various Office Stationary/miscellaneous Items: Printing Paper A4 (alpha Power) 75 Gsm, Wooden Pencil Hb, 2b, 4b ( Apsara), Marker Pen Permanent (luxor), Marker Pen Refill Ink, Colour Pastel (camel) ( 12 Pieces Box), Plastic Arm Chair (nilkama 2024-10-21
-Design,-Manufacture,-Supply,-Installation,-Training,-Testing-And-Commissioning-Of>India -Design,-Manufacture,-Supply,-Installation,-Training,-Testing-And-Commissioning-Of>Supply Of Design, Manufacture, Supply, Installation, Training, Testing And Commissioning Of Automated High Pressure Hydraulic System For Pinion Mounting And Extraction
Design, Manufacture, Supply, Installation, Training, Testing And Commissioning Of
-Design,-Manufacture,-Supply,-Installation,-Training,-Testing-And-Commissioning-Of>2024-10-21
India Supplying Of Clothing Materials To The Inmates Of Korok Children Home For Boys As Detailed In The Enclosed List For The Period Of One Year Or Such Other Time As Directed By The Superintendent, Korok Children Home For Boys From The Date Of Formal Agreement 2024-10-21
-Manufacturing-And-Supply-Of-Pre-Stressed-Mono-block-Concrete-Sleepers-(pre-tensioned-Type)-For-Level-Crossing-With-60kg-Uic-Running-Rail-And-52-Kg-Check-Rail-For-B>India -Manufacturing-And-Supply-Of-Pre-Stressed-Mono-block-Concrete-Sleepers-(pre-tensioned-Type)-For-Level-Crossing-With-60kg-Uic-Running-Rail-And-52-Kg-Check-Rail-For-B>Supply Of Running Contract Of Pre-stressed Mono-block Concrete Sleepers Special Types
Manufacturing And Supply Of Pre Stressed Mono-block Concrete Sleepers (pre-tensioned Type) For Level Crossing With 60kg Uic Running Rail And 52 Kg Check Rail For B
-Manufacturing-And-Supply-Of-Pre-Stressed-Mono-block-Concrete-Sleepers-(pre-tensioned-Type)-For-Level-Crossing-With-60kg-Uic-Running-Rail-And-52-Kg-Check-Rail-For-B>2024-10-21
India Supply Of Filter Assembly For Machine Room Ventilation For 3 Phase Loco As Per Clw Spec.no.clw/ms/3/012 Part-1 And Clw Drawing No.1209.11.135-121 Alt-2. [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2024-10-21
India Supply Of Bracket Complete For Equalising Stay On Bogie Bolster For Ac Coaches To Icf Drg. No. Wlr Rm - 0 - 4 002 Alt. C/9, Col.- Iii, Items 1, 3 & 4 In Assembled Condition. Matl. & Specn. Is: 2062/2011,grade E250 Cu C With Amndt. No. 1 Of Nov'2012 For It 2024-10-21
Whats app