Filter Search


Transportation


Location Summary Deadline
India Top Cover For Hhp Pressure Gauge .#* Top Cover For Hhp Pressure Gauge Material Transparent Teflon For Hhp Locomotive. To Be Pro cured From Past Proven Supplier Of Indian Railway Only. [ Warranty Period: 30 Months After The Date Of Del ivery ] ] 2025-10-03
India Annual Maintenance Shut-down Of Wheel Shop Equipments For Wheel Final Process Cleaning Machine-2, Peening Machine 1&2, Wfps Conveyors. Wheel Shop Equipments, Cleaning Machine, Peening Machine, Wfps Conveyors 2025-10-03
India Main Reservoir (203 Ltr.) .#* Main Reservoir (203 Ltr.) For Wag-7 Locomotives As Per Clw Drg. No. 0/3/65/234 Alt.-11. [ W arranty Period: 30 Months After The Date Of Delivery ] ] 2025-10-03
India Dummy Nipple(zinc Coated) Size: M10 X 1mm Pitch X 15mm Total Length With hexagonal Head A/f 16mm. Thread Length 8mm, Unthread Length 2mm, Unthread portion Dia 10mm. Material As Per Is: 2062, Property Class: 8.8 For Traction Motor Of 3-phase Locos. Note: O 2025-10-03
India Set Of Operating Rod Assembly For H Type Tight Lock Cbc Of Electric Locomotives As per Drawing No. C/els/lgd/ex. Ftg/3/28 Alt-2 Ref Nos.1 To 4. Set Consisting Of 4 items As Per The Attached Annexure. .#* Set Of Operating Rod Assembly For H Type Tight Lock 2025-10-03
India Mounting Arrangement Of Earthing Shunt Assembly To Taochi Wheels For Tm Tao -659 As Per Drg.no.tata/rs/misc/1013. .#* Mounting Arrangement Of Earthing Shunt Assembly To Taochi Wheels For Tm Tao -659 A s Per Drg.no.tata/rs/misc/1013. [ Warranty Period: 30 2025-10-03
India Set Of Frp Ceiling Sheet Assemblies For Lhb Ac Hot Buffet High heating Capacity Coaches. .#* Set Of Frp Ceiling Sheet Assemblies For Lhb Ac Hot Buffet High Heating Capa city Coaches, As Per Drawing: Lh44605 Alt Nil Item 1 To 26, 29,30,32,37,40, 43 To 47, 2025-10-03
India Interior Stickers With Braille Script For Lhb Slr .#* Interior Stickers With Braille Script For Lhb Slr (31 Seater) Coaches. , As Per drawing: Lr64012 Alt B Item No 2,6 To 9,22,24 To 29,32 To 35 With Braille Script To Icf/md/sp ec-253 Rev 00 Amd-02., Pack 2025-10-03
India Stainless Steel Foot Step Assembly For Lhb Coaches .#* Stainless Steel Foot Step Assembly For Lhb Coaches Drg. No. 1) 58124003, Alt "b" Item 1 To 4 In Assembled Condition - 1 No. 2) Lgs/eog-2-4- 004, Item.2 - 4 Nos. 3) Lgs/eog-2-4-004, Item 3 - 4 Nos. Spe 2025-10-03
India Glass Wiper Arrangement .#* Glass Wiper Arrangement Of Sliding Glass As Per Drg. No. Lj 54113 Alt. A (item No. 2) For Lw s Coaches.matl.&spec As Per Drg. [ Warranty Period: 30 Months After The Date Of Delivery ] [quantity Tolerance (+/-): 5 %age , Item Ca 2025-10-03
Whats app