Filter Search


Transportation


Location Summary Deadline
India Construction Of Semri Khurd To Itarsi Dolariya Road, Length 4.25 Km. 1st Call, Pac Rs. 495.80 Lacs On Road Bridge Works Sor 11.04.2025 (ammendment Upto Date), Completion Period 300 Days I/c Rainy Season. 2025-11-18
India Providing, Laying And Compaction Of Gsb In 150 Mm, Wmm 100 Mm, Wmm 75 Mm, Dbm 50 Mm, Bc 30 Mm, Fixing Of Delineators And Road Marking Complete In All Respect All As Specified Between Km 15.000 To 20.310 On Road Namti-kibithu Of 1444 Bcc Sector 2025-11-18
India Tender Invited For Repair And Overhauling Service - Rate Contract For Installation And Maintenance Of Temporaty Lighting Onboard In Vessels; Any Other Suitable Brand; No; Buyer Premises##quantity: 1## 2025-11-18
Germany Four-track Expansion Tram. Main Station Planning Services For The Lsap Planning 2025-11-18
India Supply Of Milk Collection/testing Equipment, S.s Cans And Furniture Single Rack Table, Ss Cans, Centrifuge Machine, Plastic Chair, Lockstoppers, Regulating Pins, Star Lactometer, Pippete, Butyrometer, Butyrometer Shaking Stands, Sample Bottles, Sample Bot 2025-11-18
India Supply, Installation, Commissioning And Operating (for 5 Years) Track Based Gauge face Rail Lubricators - 1 Km (electronic Type) In Secr, Nagpur Division. 2025-11-18
-Repair-And-Upgradation-Of-Road-From-Gobinda-Khatua-House-To-Nishikanta-Hazra-House-At-Rakhilya.>India -Repair-And-Upgradation-Of-Road-From-Gobinda-Khatua-House-To-Nishikanta-Hazra-House-At-Rakhilya.>Wb/pmzp/sbg/nie15/25-26,sl_11
Repair And Upgradation Of Road From Gobinda Khatua House To Nishikanta Hazra House At Rakhilya.
-Repair-And-Upgradation-Of-Road-From-Gobinda-Khatua-House-To-Nishikanta-Hazra-House-At-Rakhilya.>2025-11-18
-Repair-And-Upgradation-Of-Road-From-Sibu-Adak-House-To-Sankar-Adak-House-At-Rakhilya.>India -Repair-And-Upgradation-Of-Road-From-Sibu-Adak-House-To-Sankar-Adak-House-At-Rakhilya.>Wb/pmzp/sbg/nie15/25-26,sl_07
Repair And Upgradation Of Road From Sibu Adak House To Sankar Adak House At Rakhilya.
-Repair-And-Upgradation-Of-Road-From-Sibu-Adak-House-To-Sankar-Adak-House-At-Rakhilya.>2025-11-18
India Maintenance Of Emergency Sliding Boom And Electrically Operated Lifting Barrier at Interlocked Lc Gates In Palakkad Division For Three Years 2025-11-18
India Gaurds Chair To Rdso Drg. No. Sk-75527 Alt-5, Item No. 25. Matl.&spec. As Per Drg. .#* Gaurds Chair To Rdso Drg. No. Sk-75527 Alt-5, Item No. 25. Matl.&spec. As Per Drg. [ Warr anty Period: 30 Months After The Date Of Delivery ] [quantity Tolerance (+/-): 2025-11-18
Whats app