Filter Search


Transportation


Location Summary Deadline
-Recovery-And-Restoration-Work-Of-Tamluk-Diversion-Road-From-0.00kmp-To-3.100km-Under-Tamluk-Highway-Division,-P.w.(roads)-Directorate-In-The>India -Recovery-And-Restoration-Work-Of-Tamluk-Diversion-Road-From-0.00kmp-To-3.100km-Under-Tamluk-Highway-Division,-P.w.(roads)-Directorate-In-The>Recovery And Restoration Work Of Tamluk Diversion Road From 0.00kmp To 3.100km Under Tamluk Highway Division
Recovery And Restoration Work Of Tamluk Diversion Road From 0.00kmp To 3.100km Under Tamluk Highway Division, P.w.(roads) Directorate In The
-Recovery-And-Restoration-Work-Of-Tamluk-Diversion-Road-From-0.00kmp-To-3.100km-Under-Tamluk-Highway-Division,-P.w.(roads)-Directorate-In-The>2026-01-10
-Egra-Bajkul-Road,-From-26.00-Km-To-28.00-Km,-30.00-Km-To-32.00-Km,-49.75-Km-To-50.50-Km-And-51.00-Km-To51.40-Km,-Temporary-Patch-Repairing-Work-By-Patching-Pothole,-Repairing-Potholes,-20-Mm-Pc-And-Sc-In-Stretches-Under>India -Egra-Bajkul-Road,-From-26.00-Km-To-28.00-Km,-30.00-Km-To-32.00-Km,-49.75-Km-To-50.50-Km-And-51.00-Km-To51.40-Km,-Temporary-Patch-Repairing-Work-By-Patching-Pothole,-Repairing-Potholes,-20-Mm-Pc-And-Sc-In-Stretches-Under>Wbpwd/rd/ee/thd/nit15/25-26/5
Egra Bajkul Road, From 26.00 Km To 28.00 Km, 30.00 Km To 32.00 Km, 49.75 Km To 50.50 Km And 51.00 Km To51.40 Km, Temporary Patch Repairing Work By Patching Pothole, Repairing Potholes, 20 Mm Pc And Sc In Stretches Under
-Egra-Bajkul-Road,-From-26.00-Km-To-28.00-Km,-30.00-Km-To-32.00-Km,-49.75-Km-To-50.50-Km-And-51.00-Km-To51.40-Km,-Temporary-Patch-Repairing-Work-By-Patching-Pothole,-Repairing-Potholes,-20-Mm-Pc-And-Sc-In-Stretches-Under>2026-01-10
India Procurement Of Indian Medical Journals For The Year 2026 For Central Library, Com & Sdh, Kolkata Indian Medical Journals, International Medical Journals 2026-01-10
India Construction Of Cc Road From The House Of Rabi Roy To The House Of Pradip Roy Booth No- 44 - Digada Ef. Pi. School Scheme Id - Apas/01/191/44/0012 Gp Name- Somra - I Under Balagarh Development Block 2026-01-10
India Construction Of Cc Road Beside The Anganwadi School To Madan Singh Booth No- 66 - Inachhuda Gangadharapur Ef.pi.school Scheme Id - Apas/01/191/66/0003 Gp Name- Bakulia Dhobapara Under Balagarh Development Block 2026-01-10
India Recovery And Restoration Work Of Roads Due To Damages From Heavy Rainfall And Flood-like Situations. 2026-01-10
India Construction Of Flood Mitigation Bundh With Protective Work & Roadway At Top In Connection With Construction Of Diversion Vented Causeway Including Both Side Approach Roads For Distressed Khukurdaha Bridge. Flood Mitigation Bundh, Diversion Vented Causewa 2026-01-10
India Construction Of Concrete Road And Platform And Repairing Room And Boundary Wall And Brick With Rcc Benches In Different Location Of Ward No-13, Booth No-209, 210, 211 And 212 In Santipur Municipality Under Apas 2026-01-10
India Recovery And Restoration Work Of Sarai Link Road From 0.500 Kmp To 2.170 Kmp Under Hooghly Highway Division No. - Ii, P.w.(roads) Directorate In The District Of Hooghly For Mending Up Damages Occurred Heavy Rainfall/ Flood Like Situation During 2025. 2026-01-10
India Construction Of Road At Purba Bishnupur Mouza No 151 From H/o- Lal Bahadur Towards H/o- Ashim Rudra At Dubra Gp Apas Scheme Id- Apas/01/091/144/0006 2026-01-10
Whats app