Filter Search


Transportation


Location Summary Deadline
India Repairing Of Pcc Road And Drain At All Sansad Area Under Mohurapur Gp Within Murarai-i P/s , A/p No- 127/gpdp/2025-26, Activity Code 109416636 Fund 15th Cfc 2026-01-09
India Construction Of Bt Road Waste Plastic Madrasa More To Lalu Chai Shop Under Saraitikor Gp Within Bardhaman-i Block 2026-01-09
India Construction Of Bt Road Waste Plastic Hanuman Mandir Bokultala To Shaktigarh Kabristan Via Nijo Bhumi Nijo Griha At Paschim Barsul Under Barsul-ii Gp Within Bardhaman-ii Block 2026-01-09
India Set Of 21 Items For Fabrication Of Lhb Fiat Bogie Frames. .#* Set Of 21 Items For Fabrication Of Lhb Fiat Bogie Frames. ( For One Bogie Frame) Material Spe cifications And Dimensions As Per Enclosed Drawings Only. Each Item Description, Quantity And Drawi 2026-01-09
-Recovery-And-Restoration-Of-Link-Road-To-Kaljani-Hc,-From-2.00-Km-To-8.62-Km-(except-Chainage-From-2.400-Km-To-2.583-Km,-3.200-Km-To-3.250-Km,-From-4.500-Km-To-4.590-Km,-4.900-Km-To-4.990-Km,-8.00-Km-To-8.303-Km)-Under-Coochbehar-Highway>India -Recovery-And-Restoration-Of-Link-Road-To-Kaljani-Hc,-From-2.00-Km-To-8.62-Km-(except-Chainage-From-2.400-Km-To-2.583-Km,-3.200-Km-To-3.250-Km,-From-4.500-Km-To-4.590-Km,-4.900-Km-To-4.990-Km,-8.00-Km-To-8.303-Km)-Under-Coochbehar-Highway>Road Works
Recovery And Restoration Of Link Road To Kaljani Hc, From 2.00 Km To 8.62 Km (except Chainage From 2.400 Km To 2.583 Km, 3.200 Km To 3.250 Km, From 4.500 Km To 4.590 Km, 4.900 Km To 4.990 Km, 8.00 Km To 8.303 Km) Under Coochbehar Highway
-Recovery-And-Restoration-Of-Link-Road-To-Kaljani-Hc,-From-2.00-Km-To-8.62-Km-(except-Chainage-From-2.400-Km-To-2.583-Km,-3.200-Km-To-3.250-Km,-From-4.500-Km-To-4.590-Km,-4.900-Km-To-4.990-Km,-8.00-Km-To-8.303-Km)-Under-Coochbehar-Highway>2026-01-09
India Construction Of Cc Road From Suraj Bagdi House To Birsingh Gram Samsan Ghat Under Budbud Gp Within Galsi-i Block 2026-01-09
-Flank-Protection,-Construction-Of-Embankment-At-Bulundi-Kanaria-Road-From-Ch.-2.10-Km-To-Ch.2.55km,-Ch.4.10km-To-Ch.4.65km-And-Ch.6.35km-To-Ch.-6.90km-(effectively-1550m)-In-Stretches-Under-Arambagh-Highway-Sub-division>India -Flank-Protection,-Construction-Of-Embankment-At-Bulundi-Kanaria-Road-From-Ch.-2.10-Km-To-Ch.2.55km,-Ch.4.10km-To-Ch.4.65km-And-Ch.6.35km-To-Ch.-6.90km-(effectively-1550m)-In-Stretches-Under-Arambagh-Highway-Sub-division>Wbpwrd/ae/ahsd/enit09/2025-26
Flank Protection, Construction Of Embankment At Bulundi Kanaria Road From Ch. 2.10 Km To Ch.2.55km, Ch.4.10km To Ch.4.65km And Ch.6.35km To Ch. 6.90km (effectively 1550m) In Stretches Under Arambagh Highway Sub-division
-Flank-Protection,-Construction-Of-Embankment-At-Bulundi-Kanaria-Road-From-Ch.-2.10-Km-To-Ch.2.55km,-Ch.4.10km-To-Ch.4.65km-And-Ch.6.35km-To-Ch.-6.90km-(effectively-1550m)-In-Stretches-Under-Arambagh-Highway-Sub-division>2026-01-09
India Construction Of Cc Road From Ghora Para To Igra Tala Within Adra Gp Within Galsi-ii Block 2026-01-09
-Recovery-And-Restoration-Of-Ratherdanga-Moinatoli-Road-From-0.00-Kmp-To-9.00-Km-Under-Coochbehar-Highway-Division-In-The-District-Of-Coochbehar-For-Mending-Up-Damages-Occurred-Due-To-Heavy-Rainfall-/-Flood-Like-Situation.>India -Recovery-And-Restoration-Of-Ratherdanga-Moinatoli-Road-From-0.00-Kmp-To-9.00-Km-Under-Coochbehar-Highway-Division-In-The-District-Of-Coochbehar-For-Mending-Up-Damages-Occurred-Due-To-Heavy-Rainfall-/-Flood-Like-Situation.>Road Works
Recovery And Restoration Of Ratherdanga Moinatoli Road From 0.00 Kmp To 9.00 Km Under Coochbehar Highway Division In The District Of Coochbehar For Mending Up Damages Occurred Due To Heavy Rainfall / Flood Like Situation.
-Recovery-And-Restoration-Of-Ratherdanga-Moinatoli-Road-From-0.00-Kmp-To-9.00-Km-Under-Coochbehar-Highway-Division-In-The-District-Of-Coochbehar-For-Mending-Up-Damages-Occurred-Due-To-Heavy-Rainfall-/-Flood-Like-Situation.>2026-01-09
India Construction Of Cc Road From Vijay Murmus House Via Panchanan Tala Shiv Mandir To Palpara Barowari Tala To Mahadev Hansda Under Anukhal Gp Within Kalna-ii Block 2026-01-09
Whats app