Filter Search


Transportation


Location Summary Deadline
India Irreversible Thermal Strips Series 01-08 [irreversible Thermal Strips series 01-08 B Range 71-110 Degree Celsius For 3 Phase Locos. 01 Set consists Of 10 Strips.] .#* Irreversible Thermal Strips Series 01-08 B Range 71-110 Degree Celsius For 3 Pha se Loco 2025-10-01
India Wire Rope 8mm Steel Construction 6x19s ( [wire Rope 8mm Steel Construction 6x19s (9-9-1) As Per Is 2266:2002 For Under Slung Compressor Of Three Phase locomotives. (item Reserved For Clw Approved Sources Only).] .#* Wire Rope 8mm Steel Construction 6x19s 2025-10-01
India Modified Sand Flow Chamber (lh & Rh) In [modified Sand Flow Chamber (lh & Rh) In duly Assembled Condition With Ref No. 1 To 10 As Per Drg No.trs/acl/p-654 For wag-7 Locomotives. Set Consists Of 10 Items 80 Nos.] .#* Modified Sand Flow Chamber (lh & Rh) In 2025-10-01
India Poh Kit For M/s Escorts Make Ep Unit .#* Poh Kit For M/s Escorts Make Ep Unit To Drg.no. 2ep 6325 As Per Sketch No. Em u/mtn/be/37-r2. [one Set Consists Of 38 Items Having 44 Nos] [ Warranty Period: 30 Months Aft er The Date Of Delivery ] ] 2025-10-01
India Ss Cupboard For Lhb Hot Buffet Amrit Bharat Coaches .#* Ss Cupboard For Lhb Hot Buffet Amrit Bharat Coaches, As Per Drawing: Lwcb/p p-6-4-007 Alt R, Packing Instruction: As Per Standard Packing. It Should Be Ensured That Ite m Should Not Rub During Transp 2025-10-01
India Set Of Sensors For 3 Phase Ac Traction Motor Type Tme - 48-45-6. .#* Set Of Sensors For 3 Phase Ac Traction Motor Type Tme - 48-45-6 Of Medha Type 3 Phas e Emu Motor Coaches. Each Set Consists Of 01 No. Speed Sensor/set And 01 No Temperature Sensor/s et.s 2025-10-01
India Supply Of 33 Nos., Paramedical Staff On Outsourcing Basis To Work Under The Control Of Chief Medical Officer, Ttd To Utilize The Services At Srivari Mettu / Vqc-ii Etc. The Agency Must Deploy The Staff To Carry Out The Operations As Per The Scope Of The W 2025-10-01
India Sr.1--pad For Bolster Of Wap-1/4 Locomotive As [pad For Bolster Of Wap-1/4 locomotive As Per Clw Drg No. 03/4/12/8 Alt-3 (note: All Dimesions In Drg Is Same except Thickness Of 10 Mm Instead Of 3.5 Mm)] Sr.2--pad For Bolster Of Wap-1/4 locomotive As [pad 2025-10-01
India Shifting Of Transformer Located At Chan Mohalla Tarzoo To Ther Appropriate Place At Tarzoo A (block Sopore) Ph Tarzoo A) Under Bdc Grants 2025-26 2025-10-01
India Implementation Of Patch Management Solution. The Scope Of Work Includes Assessment And Planning, Application Deployment, Feature Configuration, Security Implementation, Integration And Testing, Documentation And Training, And Support And Maintenance. The 2025-10-01
Whats app