Filter Search


Transportation


Location Summary Deadline
United States Case, Diffuser, Aircraft 2025-09-08
India Supply Of Construction Material, Cartage Of Earth, Primer, Distemper, Paint, White Cement, Rain Water Pipe, Brick, Cement, Sand, Pvc Pipe, Brick Ballast, Cleaning Kit, Electronic Incinerator, Gi Sheet, Handpump Rebore/repair Material, Interlocking Brick, 2025-09-08
India Tender Invited For Kit Of Spares For 140v Ac Emu Carriage Fan, 450mm Sweep Consisting Of 03 Items In Each Kit: Frp Blade 450 Mm Sweep To Drg. Rdso /pe/sk/tl/0123 -2009 -01 No., Crash Worthy Upper Fan Guard ( 01 No.) And Lower Fan Guard ( 01no.) As Per Icf 2025-09-08
India Civil Engineering Works In Elimination Of Level Crossings On Kanpur Anwarganj-mandhana Section By Construction Of Elevated Track In Between Kanpur Anwarganj (excluding) - Mandhana (excluding) , Length - 15.51 Km Of North Eastern Railway On Epc Mode. 2025-09-08
United States Airframe Structural Components 2025-09-08
United States Airframe Structural Components 2025-09-08
Saudi Arabia Establishing, Operating And Maintaining The Land Transport Services Center For Cutting (69-70-71-72) Area (2800 M 2) Schemes (12/40) Abqaiq Governorate-land Transport Activities 2025-09-08
India Auxiliary Compressor Hose .#* Auxiliary Compressor Hose For Wag-9/wap-7/wap-5 As Per Clw Specn.no. Clw/ es/3/0309/d [ Warranty Period: 30 Months After The Date Of Delivery ] [quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Varia 2025-09-08
Switzerland Multi -lane Zurich - Winterthur, Preparatory Work, Project Part 213 ,planning A New Double-track Line 2025-09-08
Switzerland Multi -lane Zurich - Winterthur, Preparatory Work, Project Part 213 ,planning A New Double-track Line 2025-09-08
Whats app