Filter Search


Transportation


Location Summary Deadline
India Tender Invited For Collection & Disposal Waste Management Service - Collection, Lifting, Transportation, Unloading, Segregation Of Garbage, Ways Of Disposal; Dry Waste##quantity: 283## 2026-01-09
India Tender Invited For Collection & Disposal Waste Management Service - Collection, Lifting, Transportation, Unloading, Segregation Of Garbage, Ways Of Disposal; Dry Waste##quantity: 158## 2026-01-09
India Tender Invited For Collection & Disposal Waste Management Service - Collection, Lifting, Transportation, Unloading, Segregation Of Garbage, Ways Of Disposal; Dry Waste##quantity: 409## 2026-01-09
India Construction Of Concrete Road From Bilas Majhi House To Saraswati Majhi House At Swetpur 2026-01-09
-Shibpur-Bawrah-Road-From-0.00-Km.-To-5.50-Km.-Strengthening-Work-Under-Cooch-Behar-Division-Pwd-In-The-District-Of-Cooch-Behar-Under-Ridf-xxxi.>India -Shibpur-Bawrah-Road-From-0.00-Km.-To-5.50-Km.-Strengthening-Work-Under-Cooch-Behar-Division-Pwd-In-The-District-Of-Cooch-Behar-Under-Ridf-xxxi.>Road Works
Shibpur Bawrah Road From 0.00 Km. To 5.50 Km. Strengthening Work Under Cooch Behar Division Pwd In The District Of Cooch Behar Under Ridf-xxxi.
-Shibpur-Bawrah-Road-From-0.00-Km.-To-5.50-Km.-Strengthening-Work-Under-Cooch-Behar-Division-Pwd-In-The-District-Of-Cooch-Behar-Under-Ridf-xxxi.>2026-01-09
India Construction Of Concrete Road From Akshay Shil House Via Ananda Shil House To Nirmal Shil House At 2026-01-09
India Supply Installation And Commissioning Of 30 Hp Electrically Driven Screw Air Compressor With 3000 Litres Air Receiver, 120 Cfm Refrigerant Air Dryer, 50 Kva Voltage Stabilizer And Accessories. Scope Of Supply And Technical Specifications As Per Annexureat 2026-01-09
-Construction-Of-Pcc-Road-From-House-Of-Uttambala-To-The-House-Of-Susil-Roy-Under-Panchghora-Gp-Narayan-Pal-To-The-House-Of-Jitendranathmadhuhunderpanchghora-Gp>India -Construction-Of-Pcc-Road-From-House-Of-Uttambala-To-The-House-Of-Susil-Roy-Under-Panchghora-Gp-Narayan-Pal-To-The-House-Of-Jitendranathmadhuhunderpanchghora-Gp>Ee/wbsrda/n-25/2025-26 (2nd Call) Sl 72
Construction Of Pcc Road From House Of Uttambala To The House Of Susil Roy Under Panchghora Gp Narayan Pal To The House Of Jitendranathmadhuhunderpanchghora Gp
-Construction-Of-Pcc-Road-From-House-Of-Uttambala-To-The-House-Of-Susil-Roy-Under-Panchghora-Gp-Narayan-Pal-To-The-House-Of-Jitendranathmadhuhunderpanchghora-Gp>2026-01-09
India Construction Of Pcc Road From Biren Mal To Jatan Mal House 2026-01-09
India Strengthening Of Road From Nahayana Bus Stand To Paranchak Bus Stand Within Illambazar Block In The District Of Birbhum. Length 8.200 Km 2026-01-09
Whats app