Filter Search


Transportation


Location Summary Deadline
India Supply Of Ecotip Superstack Injector As Per Drg.no. 40083540 Alt Nil Specn: Cleaning , Packing & Marking Specn.misc:397 [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Va 2024-10-17
-Widening-From-Single-Lane-To-Intermediate-Lane-And-Strengthening-At-Km-2/0---5/0-Of-Orappam---Elathagiri---Varatanapalli-Road-Including-Cd-Works-At-Km-2/8,3/6,-3/10-And-4/6-(slm-79)>India -Widening-From-Single-Lane-To-Intermediate-Lane-And-Strengthening-At-Km-2/0---5/0-Of-Orappam---Elathagiri---Varatanapalli-Road-Including-Cd-Works-At-Km-2/8,3/6,-3/10-And-4/6-(slm-79)>Krishnagiri (h) Candm Sub Division (slm-79)
Widening From Single Lane To Intermediate Lane And Strengthening At Km 2/0 - 5/0 Of Orappam - Elathagiri - Varatanapalli Road Including Cd Works At Km 2/8,3/6, 3/10 And 4/6 (slm-79)
-Widening-From-Single-Lane-To-Intermediate-Lane-And-Strengthening-At-Km-2/0---5/0-Of-Orappam---Elathagiri---Varatanapalli-Road-Including-Cd-Works-At-Km-2/8,3/6,-3/10-And-4/6-(slm-79)>2024-10-17
-Consultancy-Service-For-Studying-The-Possibility-Of-Interconnecting-The-11.5-Kv-Sections-Of-Tpp,-Cpp-And-Unit-9-Permanently>India -Consultancy-Service-For-Studying-The-Possibility-Of-Interconnecting-The-11.5-Kv-Sections-Of-Tpp,-Cpp-And-Unit-9-Permanently>Consultancy Service For Studying The Possibility Of Interconnecting The 11.5 Kv Sections Of Tpp ,cpp And Unit 9 Permanently
Consultancy Service For Studying The Possibility Of Interconnecting The 11.5 Kv Sections Of Tpp, Cpp And Unit 9 Permanently
-Consultancy-Service-For-Studying-The-Possibility-Of-Interconnecting-The-11.5-Kv-Sections-Of-Tpp,-Cpp-And-Unit-9-Permanently>2024-10-17
-Widening-From-Single-Lane-To-Intermediate-Lane-And-Strengthening-At-Km-4/0---5/0-Of-Avalanatham-Road-Including-Cd-Works-At-Km-4/4,4/6-And-4/10-(slm-67)>India -Widening-From-Single-Lane-To-Intermediate-Lane-And-Strengthening-At-Km-4/0---5/0-Of-Avalanatham-Road-Including-Cd-Works-At-Km-4/4,4/6-And-4/10-(slm-67)>Krishnagiri (h) Candm Sub Division (slm-67)
Widening From Single Lane To Intermediate Lane And Strengthening At Km 4/0 - 5/0 Of Avalanatham Road Including Cd Works At Km 4/4,4/6 And 4/10 (slm-67)
-Widening-From-Single-Lane-To-Intermediate-Lane-And-Strengthening-At-Km-4/0---5/0-Of-Avalanatham-Road-Including-Cd-Works-At-Km-4/4,4/6-And-4/10-(slm-67)>2024-10-17
India Supply, Installation, Implementation/configuration, Customisation, Integration, Testing, Training, Maintenance And Support Of All The Items Supplied Under The Project, I.e. Etl, Data Repository, Analytics, Business Intelligence Tool, Mis/reporting System, 2024-10-17
Germany B 97n/b 168n Ou Cottbus 2. Va, Construction Lot 4.1.4 Traffic Safety And Traffic Jam Warning System 2024-10-17
Sweden Floating Services 2024-10-17
Bulgaria "selection Of A Contractor For The Supply Of Lubricants, Consumables And Auto Cosmetics For Cars For The Needs Of The Ministry Of Transport, The Specialized Units, The Institute Of Roads And Bridges And The National Toll Administration" 2024-10-17
Kuwait Training Of Pilots On The Flight Simulation Course For All Airplanes - H135 / H225 / As365n3+ 2024-10-17
India Construction Of 65 M Mtr. Wharf From Chainage 244 M To 309 M On The Lee Side Of Break Water At Androth For Coast Guard Vessels Providing External Service Power Water Supply And Firefighting Equipments Phase 2 2024-10-17
Whats app