Filter Search


Transportation


Location Summary Deadline
India Sub Kit Aoh -1 (common Items) .#* Sub Kit Aoh -1 (common Items) For Tap Changer Of M/s.repl And M/s.anantha S hree Engineers Consisting Of 29+24=53 Items, As Per Annexure-q1 And Aoh-hw1 Of Rdso Letter no Rdso Letter No List El/3.2.30, Dated 06.08.2021. [ 2025-09-29
India Micro Controller Based Electronic Speed Indicating And Recording System. .#* Microcontroller Based Electronic Speed Indicating And Recording System with Indicator (unit Master & Slave Unit) For Railway Application, As Per Drawing: Mp.0.370 0.07, Rev-07, A 2025-09-29
India Roof Mounted Ac Package Unit(rmpu)for Lhb Type Coaches With Flat roof Coach. Set Consisting Of Rmpu .#* Roof Mounted Ac Package Unit(rmpu)for Lhb Type Coaches With Flat Roof Co ach. Set Consisting Of Rmpu 02nosµprocessor Controller Unit 01no.roof Mou 2025-09-29
India Supply Of Set Of 05 Items Of X- Class .#* Supply Of Set Of 05 Items Of X- Class Locomotive As Per Annexure. [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2025-09-29
Poland Maintenance Of Non -traction Power Equipment Built On Buildings And Railway Lines Managed By Pkp Polskie Linie Kolejowe S.a. In 2026 2029 2025-09-29
Germany Lot 2: Optional / Transport Container Chairs 2025-09-29
Germany Mechanized Timber Harvesting With Harvester And Forwarding With Forwarder As Well As Storage. Harvester, Forwarder 2025-09-29
Germany Planning - Road Systems Straße Gleis 2025-09-29
Germany Mechanized Harvesting With A Harvester And Forwarding With A Forwarder, As Well As Storage. Harvester, Forwarder 2025-09-29
Spain Exploitation Of The Different Transport Networks Of The Community Of Madrid 2025-09-29
Whats app