Filter Search


Transportation


Location Summary Deadline
India Pneumatic Tube 08 Mm For 03 To 05 Bar Pressure .#* Pneumatic Tube 08 Mm For 03 To 05 Bar Pressure, Color White Material Pu/nylon For Capillary Sampling Aspirating Pipe Of Auto matic Smoke/fire Detection With Alarm System (fds) Fitted In Railway Coaches As 2025-09-30
India Bracket For Lateral Damper .#* Bracket For Lateral Damper (l-block For Lhb Bogie With Air Spring) Confirming To S355j2w+n, En10025-05:2004 And To R cf Drawing No.lw05116, Alt-b/nil. [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2025-09-30
India Inner Bracket .#* Inner Bracket (for Replacement Of Corroded J- Brackets For Mounting Of Bio-retention Tanks In Lhb Coaches) Confirming To Aisi- 316l And To Icf Drawing Drg. No. 32963250, Alt-nil [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2025-09-30
India Constant Contact Polyurethane (pu) Side Bearer Pad Assembly For High Speed casnub Bogies (design A). .#* Constant Contact Polyurethane (pu) Side Bearer Pad Assembly For High Speed Casnub Bogies (design A) As Per Their Own Drawing Approved By Rdso, Confirm 2025-09-30
India Bushing Motor Nose .#* Bushing Motor Nose Link. Emd Pt No 40076633 Alt.d. [ Warranty Period: 30 Months after The Date Of Delivery ] [quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitted: max 8 Lacs ] ] 2025-09-30
India Transverse Beam, Confirming To Plasser .#* Transverse Beam, Confirming To Plasser Part No. 64.09.1606. Accepted Make/brand: - Plass er Or Equivalent. [ Warranty Period: 30 Months After The Date Of Delivery ] [quantity Tolerance (+/-): 5 %age , Item Catego 2025-09-30
India Inter-coach Gangway Without Flexible Interior System Furnishing (including Vestibule Foot Plate) For Lhb Coaches. .#* Inter-coach Gangway Without Flexible Interior System Furnishing (including Vesti bule Foot Plate) For Lhb Coaches. Gangway Material Must 2025-09-30
-Widening-From-Two-Lane-To-Four-Lane-And-Strengthening-At-Km.71/2---73/2-Of-Ramanathapuram---Nainarkoil---Andakudi---Elayankudi---Sivagangai---Melur-Road-(sh34)-Including-Reconstruction-Of-Cul>India -Widening-From-Two-Lane-To-Four-Lane-And-Strengthening-At-Km.71/2---73/2-Of-Ramanathapuram---Nainarkoil---Andakudi---Elayankudi---Sivagangai---Melur-Road-(sh34)-Including-Reconstruction-Of-Cul>Mdu 076 / Sivagangai Division Cmrdp / Cridp Works 2025 26
Widening From Two Lane To Four Lane And Strengthening At Km.71/2 - 73/2 Of Ramanathapuram - Nainarkoil - Andakudi - Elayankudi - Sivagangai - Melur Road (sh34) Including Reconstruction Of Cul
-Widening-From-Two-Lane-To-Four-Lane-And-Strengthening-At-Km.71/2---73/2-Of-Ramanathapuram---Nainarkoil---Andakudi---Elayankudi---Sivagangai---Melur-Road-(sh34)-Including-Reconstruction-Of-Cul>2025-09-30
-Widening-From-Two-Lane-To-Four-Lane-And-Strengthening-At-Km-7/0-9/8-Of-Ramanathapuram---Nainarkoil---Andakudi---Elayankudi---Sivagangai---Melur-Road-Including-Cd-Works,centre-Median-And-Junction>India -Widening-From-Two-Lane-To-Four-Lane-And-Strengthening-At-Km-7/0-9/8-Of-Ramanathapuram---Nainarkoil---Andakudi---Elayankudi---Sivagangai---Melur-Road-Including-Cd-Works,centre-Median-And-Junction>Mdu 077 / Ramnad Division Cmrdp / Cridp Works 2025 26
Widening From Two Lane To Four Lane And Strengthening At Km 7/0-9/8 Of Ramanathapuram - Nainarkoil - Andakudi - Elayankudi - Sivagangai - Melur Road Including Cd Works,centre Median And Junction
-Widening-From-Two-Lane-To-Four-Lane-And-Strengthening-At-Km-7/0-9/8-Of-Ramanathapuram---Nainarkoil---Andakudi---Elayankudi---Sivagangai---Melur-Road-Including-Cd-Works,centre-Median-And-Junction>2025-09-30
-Widening-From-Single-Lane-To-Two-Lane-And-Strengthening-At-Km-0/0---8/0-Of-Melakidaram---M.krishnapuram-Road-Including-Cd-Works-And-Construction-Protective-Wall.>India -Widening-From-Single-Lane-To-Two-Lane-And-Strengthening-At-Km-0/0---8/0-Of-Melakidaram---M.krishnapuram-Road-Including-Cd-Works-And-Construction-Protective-Wall.>Mdu 078/ Ramnad Division Industrial Corridar / Cridp Works 2025 26
Widening From Single Lane To Two Lane And Strengthening At Km 0/0 - 8/0 Of Melakidaram - M.krishnapuram Road Including Cd Works And Construction Protective Wall.
-Widening-From-Single-Lane-To-Two-Lane-And-Strengthening-At-Km-0/0---8/0-Of-Melakidaram---M.krishnapuram-Road-Including-Cd-Works-And-Construction-Protective-Wall.>2025-09-30
Whats app