Filter Search


Transportation


Location Summary Deadline
-Hard-Facing-Of-Coal-Burner-Nozzles-And-Tips-At-Ntps.-
-Work-Contract-For-Servicing/overhauling-Of-Auxiliarie>India
-Hard-Facing-Of-Coal-Burner-Nozzles-And-Tips-At-Ntps.-
-Work-Contract-For-Servicing/overhauling-Of-Auxiliarie>Work Contract For Repairing/reconditioning Of Vfd Installed At Unit No. 5 Elp Motor Along With Installation & Commissioning And Testing.
Hard Facing Of Coal Burner Nozzles And Tips At Ntps.
Work Contract For Servicing/overhauling Of Auxiliarie
-Hard-Facing-Of-Coal-Burner-Nozzles-And-Tips-At-Ntps.-
-Work-Contract-For-Servicing/overhauling-Of-Auxiliarie>2025-09-30
India Renewal Of Cisco Meraki Enterprise And Advanced Security Licenses For 3 Years. 2025-09-30
India Tender Invited For Local Chemist Empanelment Service##quantity: 9000000## 2025-09-30
India Empanelment Of Vendors / Contractors For Composite (civil/interior, Furniture & Electrical) Works For Various Business Units/atm’s / Offices Of The Bank. The Scope Of Work Mainly Involves Interior Development Of Branch Offices, Atm’s, And Offices Etc By W 2025-09-30
India Recarpeting Of Road And Laying Of Paver Block In Adarsh Nagar, Ajmer. 2025-09-30
India Widening And Strengthening Of Road From Dev Nagar National Highway To Pushkar Railway Crossing, Pushkar. 2025-09-30
Bahrain Supply Or Koso Item 2025-09-30
Spain Drawing Drawing Drawing Drawing Drawing Drawing Drawing Drawing Drawing Drawing Drawing Drawing Drawing Drawing Drawing Drawing Drawing Drawing Drawing Drawing Drawing Drawing Drawing Drawing Drawing Drawing Drawing Drawing Drawing Drawing Drawing 2025-09-30
-Comprehensive-Annual-Maintenance-Contract-Of-04-Nos.-Continuous-Stack-Emission-Monitoring-System-(sox-Nox-Analyzers-&co-Analyzer)-Installed-At-Rtps-Units-5-To-8-For-A-Period-Of-One-Year.>India -Comprehensive-Annual-Maintenance-Contract-Of-04-Nos.-Continuous-Stack-Emission-Monitoring-System-(sox-Nox-Analyzers-&co-Analyzer)-Installed-At-Rtps-Units-5-To-8-For-A-Period-Of-One-Year.>Detailed Scope Of Work Is As Mentioned Bid Document
Comprehensive Annual Maintenance Contract Of 04 Nos. Continuous Stack Emission Monitoring System (sox Nox Analyzers &co Analyzer) Installed At Rtps Units 5 To 8 For A Period Of One Year.
-Comprehensive-Annual-Maintenance-Contract-Of-04-Nos.-Continuous-Stack-Emission-Monitoring-System-(sox-Nox-Analyzers-&co-Analyzer)-Installed-At-Rtps-Units-5-To-8-For-A-Period-Of-One-Year.>2025-09-30
India Work Contract For Repairing / Reconditioning Of Vfd Installed At Unit No. 5 Elp Motor Along With Installation And Commissioning And Testing At Nashik Thermal Power Station. The Scope Includes Dismantling Of Vfd From Panel, Replacing Damaged Parts, Factory 2025-09-30
Whats app