Filter Search


Transportation


Location Summary Deadline
India The Project Involves The Revamping Of The Material Recovery Facility (mrf) Which Includes The Installation Of Machinery And The Construction Of A Compost Plant. This Encompasses Civil, Electrical, Mechanical, And Plumbing Works, As Well As Landscaping And 2026-01-27
India The Project Involves The Revamping Of A Material Recovery Facility (mrf) And The Construction Of A Compost Plant. This Includes The Installation Of Machinery, Civil Works, And The Establishment Of Necessary Infrastructure To Process Municipal Solid Waste 2026-01-27
India The Project Involves The Revamping Of The Existing Solid Waste Management Facility In Ward 5 To Convert It Into A Material Recovery Facility (mrf) And The Establishment Of A New Mrf Along With A 5 Tpd Windrow Compost Plant. This Includes The Installation 2026-01-27
India Supply Installation Testing And Commissioning Of Rooftop Solar Pv Power Generation System Solar Pv Modules, Power Conditioning Unit, Data Monitoring System, Array Junction Box, Lightning Protection 2026-01-27
-Construction-Of-Road-From-Kashipur-To-Bali-Chuna-Shib-Mondir-Under-Bharatpur-i-Block-(length-Of-The-Road-1.586-Km)>India -Construction-Of-Road-From-Kashipur-To-Bali-Chuna-Shib-Mondir-Under-Bharatpur-i-Block-(length-Of-The-Road-1.586-Km)>75/rr2025/msd /se/rrnmu/malda/2025-26 2nd Call Sl2
Construction Of Road From Kashipur To Bali Chuna Shib Mondir Under Bharatpur-i Block (length Of The Road 1.586 Km)
-Construction-Of-Road-From-Kashipur-To-Bali-Chuna-Shib-Mondir-Under-Bharatpur-i-Block-(length-Of-The-Road-1.586-Km)>2026-01-27
India The Project Involves The Establishment Of A Chief Minister''''s Helpline And Complaint Management System (cms) For The Government Of Chhattisgarh. This Includes The Development Of A Centralized Platform For Citizens To Register Grievances, A Call Center F 2026-01-27
India Expression Of Interest (eoi) For Empanelment Of Advocates/law Firms For Ideed 2026-01-27
India Electrical Trd Work In Connection With "provision Of Electronic Interlocking System in Place Of Conventional Panel Interlocking System At Radhikapur Of Katihar division". 2026-01-27
India Ms - Vm Section - Updating, Reconciling, Certification, Revenue Department authorisation And Computerization Of Land Plans For Station Area, Railway Colony area & Mid-section And Mutation Of Lands In Ms-vm Section In Den/south/mas jurisdiction For Chennai 2026-01-27
India Corner Roller With Pin .#* Corner Roller With Pin, Confirming To Plasser Part No. 64.08.5000.21 As Per Drawing no. Secr/engg/tm/ngp/s/drg/corner Roller Warranty: Service Life Of 20 Km Of Deep Screening. Make plasser Or Own Make [ Warranty Period: 30 Month 2026-01-27
Whats app