Filter Search


Transportation


Location Summary Deadline
Germany Delivery Of Compact Sweeper With Fully Electric Drive 2024-10-30
India Supply Of (1)igbt Based 3-phase Drive Propulsion Equipment With Physical Medium I.e. Es D/emd/ofg For Multi Functional Vehicle Bus (mvb) As Per Iec 61375, Terminal Bracket, Bus Bar Link And Cu Braid Required For Connection Between Main Transformer And Tra 2024-10-30
-Running-Contract-For-Manufacture-And-Supply-Of-High-Viscous-Nylon-66-Insulating-Liners-For-Use-With-60kg-(u>India -Running-Contract-For-Manufacture-And-Supply-Of-High-Viscous-Nylon-66-Insulating-Liners-For-Use-With-60kg-(u>Supply Of Running Contract For Manufacturing And Supply Of High Viscous Nylon-66 Insulating Liner (hvn Liner) To Rdso Drg. No. T-8751 Alt.03.
Running Contract For Manufacture And Supply Of High Viscous Nylon-66 Insulating Liners For Use With 60kg (u
-Running-Contract-For-Manufacture-And-Supply-Of-High-Viscous-Nylon-66-Insulating-Liners-For-Use-With-60kg-(u>2024-10-30
-Hydraulic-Proportional-Valve-Plasser-Pt.-No.:-Hy.n.25rpe2.325tdso728,-Rexroth-Pt.-No.:-4wrz25e325-5x/6eg24n9etk4d3m.-Acceptable-Make--Plasser,-Rexroth-[-Warranty-Period:-18-Months-After-The-Date-Of-Delivery-]-]>India -Hydraulic-Proportional-Valve-Plasser-Pt.-No.:-Hy.n.25rpe2.325tdso728,-Rexroth-Pt.-No.:-4wrz25e325-5x/6eg24n9etk4d3m.-Acceptable-Make--Plasser,-Rexroth-[-Warranty-Period:-18-Months-After-The-Date-Of-Delivery-]-]>Supply Of Hydraulic Proportional Valve
Hydraulic Proportional Valve Plasser Pt. No.: Hy.n.25rpe2.325tdso728, Rexroth Pt. No.: 4wrz25e325-5x/6eg24n9etk4d3m. Acceptable Make- Plasser, Rexroth [ Warranty Period: 18 Months After The Date Of Delivery ] ]
-Hydraulic-Proportional-Valve-Plasser-Pt.-No.:-Hy.n.25rpe2.325tdso728,-Rexroth-Pt.-No.:-4wrz25e325-5x/6eg24n9etk4d3m.-Acceptable-Make--Plasser,-Rexroth-[-Warranty-Period:-18-Months-After-The-Date-Of-Delivery-]-]>2024-10-30
India Selection Of Concessionaire For "implementation Of Energy Efficiency Project For Streetlights By Replacement Of Existing Conventional Lamps With Led Lamps Along With Centralized Control & Monitoring System (ccms) In Rajarajeshwarinagara And Dasarahalli Zo 2024-10-30
India Selection Of Concessionaire For "implementation Of Energy Efficiency Project For Streetlights By Replacement Of Existing Conventional Lamps With Led Lamps Along With Centralized Control & Monitoring System (ccms) In West And Yelahanka Zones Of Bbmp In Ben 2024-10-30
India Road Transportation Of Scrap Cut Rails. The Above Work Involves : (a)collection Of Scrap Rails Available At Various Locations Of Indian Railways. (b) Cutting The Scrap Rails To A Length Size Measuring Upto 3(three) Metres (c)loading The Scrap Cut Rails In 2024-10-30
France Regular Land Transport Of Children By Vehicles With Fewer Than 10 Seats 202406 2024-10-30
Poland "construction Of Lcs At The Wola Baranowska Lhs Station Together With The Expansion Of The Huta Deregowska Lhs Passing Loop" 2024-10-30
-Jhalda-bagmundi-Road,-From-25-Kmp-To-34-Kmp,-Dressing,-Chilchalling-And-Restoration-Of-Road-Flank-Under-Purulia-Highway-Division-In-The-District-Of-Purulia.>India -Jhalda-bagmundi-Road,-From-25-Kmp-To-34-Kmp,-Dressing,-Chilchalling-And-Restoration-Of-Road-Flank-Under-Purulia-Highway-Division-In-The-District-Of-Purulia.>Wbpwrd/ae/bhsd/enit-03 /24-25/1
Jhalda-bagmundi Road, From 25 Kmp To 34 Kmp, Dressing, Chilchalling And Restoration Of Road Flank Under Purulia Highway Division In The District Of Purulia.
-Jhalda-bagmundi-Road,-From-25-Kmp-To-34-Kmp,-Dressing,-Chilchalling-And-Restoration-Of-Road-Flank-Under-Purulia-Highway-Division-In-The-District-Of-Purulia.>2024-10-30
Whats app