Filter Search


Transportation


Location Summary Deadline
-Construction-Of-Concrete-Road-S/f-H/o-Dibakar-Saha-To-H/o-Fayjel-Nurbab-To-H/o-Asgar-Ali-Through-H/o-Momen-Mollah-To-H/o-Usman-Ali-And-H/o-Sk-Abdul-Ajij-To-H/o-Sk-Jabed-Ali-And-H/o-Sk-Jaynel-To-H/o-Riajul-Ali-At-Nurbab-Para>India -Construction-Of-Concrete-Road-S/f-H/o-Dibakar-Saha-To-H/o-Fayjel-Nurbab-To-H/o-Asgar-Ali-Through-H/o-Momen-Mollah-To-H/o-Usman-Ali-And-H/o-Sk-Abdul-Ajij-To-H/o-Sk-Jabed-Ali-And-H/o-Sk-Jaynel-To-H/o-Riajul-Ali-At-Nurbab-Para>08/aram/2024-25(sl No-01)
Construction Of Concrete Road S/f H/o Dibakar Saha To H/o Fayjel Nurbab To H/o Asgar Ali Through H/o Momen Mollah To H/o Usman Ali And H/o Sk Abdul Ajij To H/o Sk Jabed Ali And H/o Sk Jaynel To H/o Riajul Ali At Nurbab Para
-Construction-Of-Concrete-Road-S/f-H/o-Dibakar-Saha-To-H/o-Fayjel-Nurbab-To-H/o-Asgar-Ali-Through-H/o-Momen-Mollah-To-H/o-Usman-Ali-And-H/o-Sk-Abdul-Ajij-To-H/o-Sk-Jabed-Ali-And-H/o-Sk-Jaynel-To-H/o-Riajul-Ali-At-Nurbab-Para>2024-10-29
-Additional-Estimate-For-Improvement-Of-Bituminous-Road-Starting-From-Beside-Of-Reliance-Petrol-Pump-To-Archana-Gupta-House-Through-Jaydeb-Basu-House,-Samir-Kanti-Panja-House,-Biswanath-Barik-Houseand-Sanjay-Thakur-House-At>India -Additional-Estimate-For-Improvement-Of-Bituminous-Road-Starting-From-Beside-Of-Reliance-Petrol-Pump-To-Archana-Gupta-House-Through-Jaydeb-Basu-House,-Samir-Kanti-Panja-House,-Biswanath-Barik-Houseand-Sanjay-Thakur-House-At>08/aram/2024-25(sl No-02)
Additional Estimate For Improvement Of Bituminous Road Starting From Beside Of Reliance Petrol Pump To Archana Gupta House Through Jaydeb Basu House, Samir Kanti Panja House, Biswanath Barik Houseand Sanjay Thakur House At
-Additional-Estimate-For-Improvement-Of-Bituminous-Road-Starting-From-Beside-Of-Reliance-Petrol-Pump-To-Archana-Gupta-House-Through-Jaydeb-Basu-House,-Samir-Kanti-Panja-House,-Biswanath-Barik-Houseand-Sanjay-Thakur-House-At>2024-10-29
-Supply,-Installation-And-Commissioning-For-Complete-Fumishing-Of-Lhb-Non-ac-3-Tier-Sleeper-(lwscn)>India -Supply,-Installation-And-Commissioning-For-Complete-Fumishing-Of-Lhb-Non-ac-3-Tier-Sleeper-(lwscn)>Supply Of Supply, Installation And Commissioning For Complete Fumishing Of Lhb Non-ac 3 Tier Sleeper (lwscn) Coaches On Turnkey Basis To Pl:33981437.
Supply, Installation And Commissioning For Complete Fumishing Of Lhb Non-ac 3 Tier Sleeper (lwscn)
-Supply,-Installation-And-Commissioning-For-Complete-Fumishing-Of-Lhb-Non-ac-3-Tier-Sleeper-(lwscn)>2024-10-29
France Supply Of Secondary Transport Packaging For The French Blood Establishment 2024-10-29
Croatia Employee Transportation And Passenger Transportation Services At The Bus Stop 2024-10-29
Germany Assembly Board Assemblies Mfb08 2024-10-29
India Construction Of Concrete Road S/f Arambagh Burdwan Main Road To H/o Sukumar Soren In Ward No. 16, At Jyoti Pally Under Arambagh Municipality, Arambagh, Hooghly. 2024-10-29
Poland Szp/242168/2024 Purchase Of Equipment (apparatus/devices/software) As Part Of The Project Entitled "detection And Combating Of Unmanned Aerial Vehicles (uavs) Using A High-power Microwave Pulse Generator (hpm) With Directional Emission/vector" Tasks 2024-10-29
India Request For Proposal For Selection Of Consultancy Organization To Setup City Technical Support Unit Ctsu 2024-10-29
Philippines Construction & Maintenance Of Street Lights(caraisan) 2024-10-29
Whats app