Filter Search


Transportation


Location Summary Deadline
Saudi Arabia Supply And Installation Of Sea Barriers (passive Defense) For The Ports Of The East Coast (king Abdulaziz Port In Dammam - Jubail Commercial Port - King Fahd Industrial Port In Jubail - Ras Al-khair Port 2026-01-27
New Zealand Ev Roam Platform Replacement 2026-01-27
India Procurement Of 12000 Ltr Capacity Water Cannon For The Use Of West Bengal Police 2026-01-27
India Fire Retardant Rubber .#* Fire Retardant Rubber Profile As Per Drg. No. Ld 56150 Alt Nil. With Mcf Specification Mmdt s 20047 Rev. Nil [ Warranty Period: 30 Months After The Date Of Delivery ] [quantity Tolerance (+/-): 5 %age , Item Category : Normal , T 2026-01-27
India Design, Supply, Installation, Testing And Commissioning Of Electronic Interlocking (e.i) System Along With Other Indoor And Outdoor Signalling Works At Gholvad, pardi Stations Of Mumbai Division, Western Railway. 2026-01-27
India Construction Of Road Pungro- Thongsonyu From Km 0.00 To Km 20.00 (package-i) (total Length 20.000 Km) To Nhsl Specification Under 89rcc/15 Brtf/ Project Sewak In Nagaland State Under Epc Mode 2026-01-27
Germany Moving And Transport Services At The Giz Berlin Location 2026-01-27
India Overlay And Routine Maintenance Of Narmada Bridge Section Of Nh-48 From Km. 192.000 To 198.745 In The State Of Gujarat On Item Rate (percentage) Basis 2026-01-27
India Independent Engineer Service For O And M Of Constr. Of 4l Or 6l Access Controlled Exp. From Junc. With Pnk Gurdaspur Road Nh54 Near Balsua To Junc. With Hiranagar Road Vill. Gurha Baildaran Km 423.500 468.100 Dke Ham In Ut Of Jk Pkg14 Phase Ii 2026-01-27
-Balanc>India -Balanc>Balance Work Of Rehabilitation And Upgradation Of Karnataka Ap Bordergooty Section From Km 368 920 To Km 424 225 Design Ch 375 740 To 433 032 Of Nh 63 New Nh 67 To Four Lane With Paved Shoulder In The State Of Andhra Pradesh Through Epc Basis
Balanc
-Balanc>2026-01-27
Whats app