Filter Search


Transportation


Location Summary Deadline
India Balance Work For Construction Of Boundary Wall, Dismantling Concrete Road Including Mending Work, Construction Of Approach Road By Fillup Stone Dust , Bolders On Lowland At Ohr Site And Etc Allied Works Under Panduk W/s Scheme 2024-10-28
India Construction Of Concrete Road From Safik House To Sufal Chakraborty House Jl No. 19. Plot No 1422 Under Chanak Gp Within Mongalkote P.s. 2024-10-28
India Construction Of Concrete Road From Hitu Sk Dokan To Momejul Sk House Jl. No. 2. Plot No 973-995 Under Paligram Gp Within Mongalkote Ps 2024-10-28
India Construction Of Concrete Road From Midder Par To Dherer Par Jl No. 111 Plot No. 1259-929 Under Kaichar-ii Gp Within Mongalkote P.s 2024-10-28
India Construction Of Concrete Road From Kazipara Sadar Rasta To Masjidtala Jl No. 32 Plot No. 4352-4368 To 941 Under Gotistha Gp Within Mongalkote P.s 2024-10-28
India Design, Construction, Supply, Transportation, Testing And Commissioning Of Steel Pontoon And Gangway For Providing Floating Terminal Facilities At Karimganj Inland Water Transport Terminal In Ibp Route (3,4 And 7,8) In The State Of Assam Form 2 2024-10-28
India Design, Construction, Supply, Transportation, Testing And Commissioning Of Steel Pontoon And Gangway For Providing Floating Terminal Facilities At Karimganj Inland Water Transport Terminal In Ibp Route (3,4 And 7,8) In The State Of Assam Form Fin 2a 2024-10-28
India Charkhari Supa Srinagar Akona Jaitpur Road (main District Road) Widening And Strengthning From 1km To 25.20km (length Of Road 24.20km) In District Mahoba (electrical Pole Shifting Work). 2024-10-28
India 11kv And Lt Lelectrical Pole Shifting Work During Road Widening And Strengthning From 2km To 11km Of Kabrai Kunehta Road In District Mahoba. 2024-10-28
-Restoration-Of-Road-Surface-From-Chainage-7.00-Kmp.-To-8.00-Kmp.-Airport-Bound-Flank-Main-Carriageway,-In-Stretches,-Of-Kni-Avenue-Under-Barasat-Highway-Division-I-In-The-District-Of-North-24-Parganas.>India -Restoration-Of-Road-Surface-From-Chainage-7.00-Kmp.-To-8.00-Kmp.-Airport-Bound-Flank-Main-Carriageway,-In-Stretches,-Of-Kni-Avenue-Under-Barasat-Highway-Division-I-In-The-District-Of-North-24-Parganas.>Wbpwrd/ee/bhd-i/enit13/24-25/1
Restoration Of Road Surface From Chainage 7.00 Kmp. To 8.00 Kmp. Airport Bound Flank Main Carriageway, In Stretches, Of Kni Avenue Under Barasat Highway Division I In The District Of North 24 Parganas.
-Restoration-Of-Road-Surface-From-Chainage-7.00-Kmp.-To-8.00-Kmp.-Airport-Bound-Flank-Main-Carriageway,-In-Stretches,-Of-Kni-Avenue-Under-Barasat-Highway-Division-I-In-The-District-Of-North-24-Parganas.>2024-10-28
Whats app