Filter Search


Transportation


Location Summary Deadline
-Set-Of-Cab-Window-Assembly-Conisiting-Of-Both-Lh-&-Rh-(02-Nos-Each-i.e-Consists-02items-And-Total-04-Nos)-To-Specs-No.-Clw/ms/3/014-Alt-5-Or-Latest-Till-The-Closing-Date-Of-Tender-[-Warranty-Period:-30-Mo>India -Set-Of-Cab-Window-Assembly-Conisiting-Of-Both-Lh-&-Rh-(02-Nos-Each-i.e-Consists-02items-And-Total-04-Nos)-To-Specs-No.-Clw/ms/3/014-Alt-5-Or-Latest-Till-The-Closing-Date-Of-Tender-[-Warranty-Period:-30-Mo>Supply Of Set Of Cab Window Assembly Lh & Rh
Set Of Cab Window Assembly Conisiting Of Both Lh & Rh (02 Nos Each-i.e Consists 02items And Total 04 Nos) To Specs No. Clw/ms/3/014 Alt-5 Or Latest Till The Closing Date Of Tender [ Warranty Period: 30 Mo
-Set-Of-Cab-Window-Assembly-Conisiting-Of-Both-Lh-&-Rh-(02-Nos-Each-i.e-Consists-02items-And-Total-04-Nos)-To-Specs-No.-Clw/ms/3/014-Alt-5-Or-Latest-Till-The-Closing-Date-Of-Tender-[-Warranty-Period:-30-Mo>2024-10-23
Germany Passenger Transport By Bus According To The Pbefg; Mvv Regional Bus Line 369. 2024-10-23
India Demolition And Reconstruction Of Single-entry Hardened Air Craft Shelters And Construction Of Two Single Entry Orp Blast Pens At Runway End Alonggwith Associated Work Services At Af Stn Bkt 2024-10-23
Morocco Routine Track Maintenance Work (surfacing) 2024-10-23
India Electrical And Mechanical Works Comprising Of Lt Panels, Lt Cables, Lighting, Hydraulics, Fire Safety Systems, Ups, Dg Sets, Hvac And Bms For 28 Nos. Of Elevated Stations, 2 Nos. Of Way Side Tss And Cut-and-cover Section Of Bmrcl Ph-2a And 2b Project 2024-10-23
India Supply Of Lifting Roller , Plasser Part No. Dl150.01i Sub. E150.0, As Per Rdso Specification:tm/hm/6/21 Rev-2 And Rdso Drawing:tm/9322 Rev-2(2017). Make-plasser Or Equivalent. [ Warranty Period: 9 Months After The Date Of Delivery ][quantity Tolerance (+/ 2024-10-23
-Rubber-Snubber-For-Bogie-Bolster-Suspension-Arrangement-To-Icf-Drg.-No.-Emu/m-0-5-020-Alt.-D/5-(small-D-By-5)-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quantity-Toler>India -Rubber-Snubber-For-Bogie-Bolster-Suspension-Arrangement-To-Icf-Drg.-No.-Emu/m-0-5-020-Alt.-D/5-(small-D-By-5)-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quantity-Toler>Supply Of Rubber Snubber For Bogie Bolster Suspension Arrangement.
Rubber Snubber For Bogie Bolster Suspension Arrangement To Icf Drg. No. Emu/m-0-5-020 Alt. D/5 (small D By 5) [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Toler
-Rubber-Snubber-For-Bogie-Bolster-Suspension-Arrangement-To-Icf-Drg.-No.-Emu/m-0-5-020-Alt.-D/5-(small-D-By-5)-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quantity-Toler>2024-10-23
-Wedge-For-Casnub-Bogie-To-Rdso-Drg.-No.-Sk-77579-Alt-7,-Item-1,-Matl.-&-Spec.-As-Per-Drg.[quantity-Tolerance-(+/-):-5-%age-,-Item-Category-:-Normal-,-Total-Po-Value-Variation-Permitted:-Max-8-Lacs]-]>India -Wedge-For-Casnub-Bogie-To-Rdso-Drg.-No.-Sk-77579-Alt-7,-Item-1,-Matl.-&-Spec.-As-Per-Drg.[quantity-Tolerance-(+/-):-5-%age-,-Item-Category-:-Normal-,-Total-Po-Value-Variation-Permitted:-Max-8-Lacs]-]>Supply Of Wedge For Casnub Bogie.
Wedge For Casnub Bogie To Rdso Drg. No. Sk-77579 Alt-7, Item-1, Matl. & Spec. As Per Drg.[quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitted: Max 8 Lacs] ]
-Wedge-For-Casnub-Bogie-To-Rdso-Drg.-No.-Sk-77579-Alt-7,-Item-1,-Matl.-&-Spec.-As-Per-Drg.[quantity-Tolerance-(+/-):-5-%age-,-Item-Category-:-Normal-,-Total-Po-Value-Variation-Permitted:-Max-8-Lacs]-]>2024-10-23
India Consultancy Services For Independent Engineer For Construction Of Six Laning Of Surat Nashik Ahmednagar Solapur Mh-knt Border Greenfield Stretch Package-1 In The State Of Maharashtra On Hybrid Annuity Mode Under Nh(o) 2024-10-23
India Consultancy Services For Independent Engineer For Construction Of Six Laning Of Surat Nashik Ahmednagar Solapur Mh/knt Border Greenfield Stretch Package 2 In The State Of Maharashtra On Hybrid Annuity Mode Under Nh(o) 2024-10-23
Whats app