Filter Search


Transportation


Location Summary Deadline
India Spring For Brake Head For Wap-4 .#* Spring For Brake Head For Wap-4 Locos As Per Drawing No. 29.08.02, Ref.-44. [ Warran y Period: 30 Months After The Date Of Delivery ] ] 2025-12-29
India "acquisition Of Private Land, Diversion Of Forest Land, Obtaining Forest Clearance And wildlife Clearance In Connection With The Gondia-jabalpur (kachhpura) (230.50 Km) doubling Project In Nagpur Division Of South East Central Railway." 2025-12-29
Argentina Track Renewal In Specific Sections Of The Retiro – José León Suarez Branch Line. Mitre Line 2025-12-29
India Scr Construction Organization - Appointment Of Authority Engineer For Providing project Management Services For Construction Of New Bg Line Between Nadikudi and Srikalahasti Stations In Guntur Division Of South Central Railway. 2025-12-29
India Tender Invited For Pad For Secondary Suspension, To Drawing / Specification No.1903149 Ver A, Confirming To Spec. No.t.s. 17.477.100.02. [ Warranty Period: 48 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , 2025-12-29
India Grab Handle For Icf- Emu Trailer Coaches. .#* Grab Handle For Icf- Emu Trailer Coaches. Rdsos Drg.no. Cg-12064 Alt "nil" Con sisting Of Items No.1,2,3,4,5,6,7,11,12 & 13 [ Warranty Period: 30 Months After The Date Of Delivery ] [quantity Tolerance (+/-): 2025-12-29
-Hiring-Of-01-(one)-No.-70ton-Bollard-Pull-Astds-Tug-For-Handing-Fully-Loaded-Cape-V>India -Hiring-Of-01-(one)-No.-70ton-Bollard-Pull-Astds-Tug-For-Handing-Fully-Loaded-Cape-V>Hiring Of 01 (one) No. 70ton Bollard Pull Astds Tug For Handing Fully Loaded Cape Vessel And Spm Operation For A Period Of 07 (seven) Years At Paradip Port Authority
Hiring Of 01 (one) No. 70ton Bollard Pull Astds Tug For Handing Fully Loaded Cape V
-Hiring-Of-01-(one)-No.-70ton-Bollard-Pull-Astds-Tug-For-Handing-Fully-Loaded-Cape-V>2025-12-29
India Road Work Road Construction 2025-12-29
-Work-Of-Widening-And-Strengthening-From-2l-Ps-To-4-Lane-With>India -Work-Of-Widening-And-Strengthening-From-2l-Ps-To-4-Lane-With>Work Of Widening And Strengthening From 2l Ps To 4 Lane With Paved Shoulder From Km 0/600 To Km 8/200 Of Nh 848b Of Valsad District In The State Of Gujarat Total Length 7.60 Km On Epc Mode
Work Of Widening And Strengthening From 2l Ps To 4 Lane With
-Work-Of-Widening-And-Strengthening-From-2l-Ps-To-4-Lane-With>2025-12-29
India Cs For Ae For Const. Of 4l Nagpur-katol Sec Of Nh353j Include. Mitigation Structures From Design Ch.37.000 To Ch.45.990 Tc-i And From Design Ch. 50.400 To Ch63.100 Tc-ii In Maharashtra On Epc Mode 2025-12-29
Whats app