Filter Search


Transportation


Location Summary Deadline
India Strengthening At Km /-/of Ammatchiyapuram Road ,2.0 ,road Work ,advance Patch Work Using 45 Mm Irc Size Hbg Metal For Making The Pot Holes And Patching Using Vg10 Grade Bitumen Including Mixing At The Rate Of 44 Kg / Cum Of Chips After Trimming The P 2025-09-25
-Widening-From-Intermediate-Lane-To-Two-Lane-And-Strengthening-At-Km-4/670---6/080,-6/540---8/4-Of-Kottur---Kamatchipuram-Road-(md1185)>India -Widening-From-Intermediate-Lane-To-Two-Lane-And-Strengthening-At-Km-4/670---6/080,-6/540---8/4-Of-Kottur---Kamatchipuram-Road-(md1185)>Mdu 009 / Theni Division /cridp Works 2025 26
Widening From Intermediate Lane To Two Lane And Strengthening At Km 4/670 - 6/080, 6/540 - 8/4 Of Kottur - Kamatchipuram Road (md1185)
-Widening-From-Intermediate-Lane-To-Two-Lane-And-Strengthening-At-Km-4/670---6/080,-6/540---8/4-Of-Kottur---Kamatchipuram-Road-(md1185)>2025-09-25
-Widening,-Strengthening-And-Improvements-To-Riding-Quality-Including-Construction-Of-Drain-Culvert-Works-In-The-Government-Roads-Of-Uthamapalayam-And-Theni-(h)-C-M-Sub-Divisions-(mdu-016)>India -Widening,-Strengthening-And-Improvements-To-Riding-Quality-Including-Construction-Of-Drain-Culvert-Works-In-The-Government-Roads-Of-Uthamapalayam-And-Theni-(h)-C-M-Sub-Divisions-(mdu-016)>Mdu 016 / Theni Division /cridp Works 2025 26
Widening, Strengthening And Improvements To Riding Quality Including Construction Of Drain Culvert Works In The Government Roads Of Uthamapalayam And Theni (h) C M Sub Divisions (mdu 016)
-Widening,-Strengthening-And-Improvements-To-Riding-Quality-Including-Construction-Of-Drain-Culvert-Works-In-The-Government-Roads-Of-Uthamapalayam-And-Theni-(h)-C-M-Sub-Divisions-(mdu-016)>2025-09-25
-Strenthening-And-Improvements-To-Riding-Quality-Works-In-The-Government-Roads-Of-Periyakulam-(h)-C-M-Sub-Division-(mdu-017)>India -Strenthening-And-Improvements-To-Riding-Quality-Works-In-The-Government-Roads-Of-Periyakulam-(h)-C-M-Sub-Division-(mdu-017)>Mdu 017 / Theni Division /cridp Works 2025 26
Strenthening And Improvements To Riding Quality Works In The Government Roads Of Periyakulam (h) C M Sub Division (mdu-017)
-Strenthening-And-Improvements-To-Riding-Quality-Works-In-The-Government-Roads-Of-Periyakulam-(h)-C-M-Sub-Division-(mdu-017)>2025-09-25
United States 1680 - Repair Of Nsn 7r1680016193392, Qty 1 And Nsn 7r1680016193388, Qty 2, In Support Of Fms Uk For The P8 Aircraft System. 2025-09-25
India 4 Laning Of Marakkanam-puducherry Section Of Nh-332a From Km 62.000-km 108.047 In Tamil Nadu On Ham (project Length-46.047 Km) (mahabalipuram-puducherry Package-iii) 2025-09-25
India Consultancy Services For Preparation Of Cs For Preparation Of Dpr For 3 Nos Of Construction Of Vups At Ch Km 4.500 And Km 37.500 Govindpur Chas Section Of Nh18 Old Nh-32 And At Ch. Km 19.700 Jaina More Location Of Nh320 Old Nh 23 2025-09-25
India Bolster Liner Boxn .#* Bolster Liner Boxn Drg. No. Wd-85079-s/3 Item 2 Alt-7 Specn As Per Drawing. [ Warranty period: 30 Months After The Date Of Delivery ] [quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitted: M 2025-09-25
India Housing For Traction Bar .#* Housing For Traction Bar As Per Clw Drg.no.1209.01.113.002, Alt-8 And Rdso Smi No. Rdso/2 006/el/0241, Rev-0 Dt.24.10.06 [ Warranty Period: 30 Months After The Date Of Delivery ] [quantity Tolerance (+/-): 5 %age , Item Catego 2025-09-25
India Supply, Installation & Commissioning Of Eot Crane, Capacity 10/3 Ton . .#* Supply, Installation & Commissioning Of Eot Crane, Capacity 10/3 Ton As Per Ecr Specificati on No. : Ecr/eotc-2025, Rev- 02 ( Based On Cofmow Specification No. - Cofmow/ir/eotc-202 2025-09-25
Whats app