Filter Search


Transportation


Location Summary Deadline
India Supply Of A4 Paper, Legal Paper, V7 Hi Tech Pen Blue Green Red, Ink For Hi Tech Pen Blue Green Red, Reynolds Pen Blue Black Red, Register 400 Pages, Register 200 Pages, Stapler Pin Small, Paper Flags, Brown Tape 2 Inch, White Tape 2 Inch, White Tape 1 Inc 2024-10-25
India Construction Of Concrete Road From Joydeb Samanta House To Biswanth Samanta House Via Tarun Bera 2024-10-25
-400-Nos-Black-Bengal-Does-(age-Not-Less-Than-9-Months-Body-Weight-9-Kg-And-Above-For-Balurghat-Sub-Division-(including-All-Taxes-And-Charges-And-Transportation-)>India -400-Nos-Black-Bengal-Does-(age-Not-Less-Than-9-Months-Body-Weight-9-Kg-And-Above-For-Balurghat-Sub-Division-(including-All-Taxes-And-Charges-And-Transportation-)>1 Of 2024-25
400 Nos Black Bengal Does (age Not Less Than 9 Months Body Weight 9 Kg And Above For Balurghat Sub Division (including All Taxes And Charges And Transportation )
-400-Nos-Black-Bengal-Does-(age-Not-Less-Than-9-Months-Body-Weight-9-Kg-And-Above-For-Balurghat-Sub-Division-(including-All-Taxes-And-Charges-And-Transportation-)>2024-10-25
-Set-Of-E-type-Led-Based-Marker-Light-Assembly-Complete-As-Per-Rdso-Spec.-No.-Elrs/spec/pr/0022(rev.-1)-Oct-2004-And-As-Per-Metro-Railways'-Drawing-No.-Mr/poh/1-034-(in-2-sheets).-Each-Set-Consists-Of-(i>India -Set-Of-E-type-Led-Based-Marker-Light-Assembly-Complete-As-Per-Rdso-Spec.-No.-Elrs/spec/pr/0022(rev.-1)-Oct-2004-And-As-Per-Metro-Railways'-Drawing-No.-Mr/poh/1-034-(in-2-sheets).-Each-Set-Consists-Of-(i>Supply Of Set Of E-type Led Based Marker Light
Set Of E-type Led Based Marker Light Assembly Complete As Per Rdso Spec. No. Elrs/spec/pr/0022(rev. 1) Oct 2004 And As Per Metro Railways' Drawing No. Mr/poh/1-034 (in 2-sheets). Each Set Consists Of (i
-Set-Of-E-type-Led-Based-Marker-Light-Assembly-Complete-As-Per-Rdso-Spec.-No.-Elrs/spec/pr/0022(rev.-1)-Oct-2004-And-As-Per-Metro-Railways'-Drawing-No.-Mr/poh/1-034-(in-2-sheets).-Each-Set-Consists-Of-(i>2024-10-25
India Supply Of Bare Pump - Model: Um-2 Size Nb 80 X Nb 80 - 8250 Lph, 2 Kgf/cm2 Without Base Frame Motor Of Cl, Bush With Bush Block Of Clean Oil Pump, Type-um-2, Drive Driven Gear With Shaft In Assembled Condition Of Clean Oil Pump, Type-um-2, Mechanical Seal 2024-10-25
-Ss-Lav-Inlay-For-Lhb-Ac-Coaches-Along-With-Supporting-Structure-For-Pan-(-L.h-)-Consisting-Of-Item-No.-1-&-3-Of-Drg-No.-Llh---34/2024.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]>India -Ss-Lav-Inlay-For-Lhb-Ac-Coaches-Along-With-Supporting-Structure-For-Pan-(-L.h-)-Consisting-Of-Item-No.-1-&-3-Of-Drg-No.-Llh---34/2024.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]>Supply Of Ss Lav Inlay For Lhb Ac Coaches
Ss Lav Inlay For Lhb Ac Coaches Along With Supporting Structure For Pan ( L.h ) Consisting Of Item No. 1 & 3 Of Drg No. Llh - 34/2024. [ Warranty Period: 30 Months After The Date Of Delivery ] ]
-Ss-Lav-Inlay-For-Lhb-Ac-Coaches-Along-With-Supporting-Structure-For-Pan-(-L.h-)-Consisting-Of-Item-No.-1-&-3-Of-Drg-No.-Llh---34/2024.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]>2024-10-25
India Additional Work Of Concrete Road And Bituminous Road Restoration Laying Of Ms Pipe Fhtc Land Development Of H/w Site Drain And Internal Path Way Concrete Road And Bitumious Road Restoration Laying Of Ms Pipe And Necessary Allied Works Of Under Jalkan 2024-10-25
India Integrated Solid Waste Management I.e. Sweeping/cleaning Of Roads, Streets, Drains, Door To Door Collection, Transportation, Processing And Disposal Of Municipal Solid Waste, And Operational Processing Plant At Trenching Ground. 2024-10-25
India Balance Work For Krishnarampur Piped W/s Scheme ,construction Of Boundary Walls With Gates And Land Development Drain And Internal Pathway Etc At 3rd Pump House Site And Fhtc Work Under Galsi-i ,purba Bardhaman 2024-10-25
-Push-Fitting-Consisting-Of-04-Items-As-Per-Annexure-Attached-As-Per-Mmdts:-19027-Rev---3-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]>India -Push-Fitting-Consisting-Of-04-Items-As-Per-Annexure-Attached-As-Per-Mmdts:-19027-Rev---3-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]>Supply Of Push Fitting Consisting Of 04 Items
Push Fitting Consisting Of 04 Items As Per Annexure Attached As Per Mmdts: 19027 Rev - 3 [ Warranty Period: 30 Months After The Date Of Delivery ] ]
-Push-Fitting-Consisting-Of-04-Items-As-Per-Annexure-Attached-As-Per-Mmdts:-19027-Rev---3-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]>2024-10-25
Whats app