Filter Search


Transportation


Location Summary Deadline
India Sni Of Ss Long Hh Col-i Emu/hl. .#* Ss Longitudinal Hand Holds For Emu (harbour Line And Cidco) Coaches To D rg. No.icf/std-6-4-069, Col - I, Alt-c. [ Warranty Period: 30 Months After The Date Of Delivery ] [quantity Tolerance (+/-): 5 %age , Item Categor 2026-01-28
India Supply Of Insulation Bond Sleeve Suitable For Bond Strip Size 40 Mm X 6 Mm As Per drawing (b/trd/ohe/p/1/25) Attached. .#* Supply Of Insulation Bond Sleeve Suitable For Bond Strip Size 40 Mm X 6 Mm As Per Drawing ( b/trd/ohe/p/1/25) Attached. ] 2026-01-28
India Control Arm With Bottom Cover For Train- [control Arm With Bottom Cover For Train-18 coaches As Per Drg. Nos. I) Aaa02105, Alt A - (qty. 1 Nos.) And Ii) Aaa02106, Alt A - (qty. 1 Nos.), Above Items To Be Manufactured And Supplied As Set. ] .#* Control Arm 2026-01-28
India Driver Seat Assembly With Reclining, Sliding And Height Adjustment Mechanism, As Per drg. No. 11811717 Alt. %u2018z%u2019 Spec :hhp/veh/001, Specification For Cleaning, marking And Packing Misc.444 .#* Driver Seat Assembly With Reclining, Sliding And Heig 2026-01-28
India Gauge For Casnub Bogie .#* Gauge For Casnub Bogie (description &drawing No. As Per Rdsog-95 Manual)as Per Annexu re-a [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2026-01-28
India Tender Invited For Controller 24 Vdc, Part No. - X85535 , Way Valve Wv-m- W20-1, 2.24v, Part No. - 525320831 , Pressure Switch, Part No. - 69630 , Motor , Part No. - 272545 , Timer Board For X85535, Part No. - X250599 , Pressure Relief Valve, Safety Unloa 2026-01-28
India Heavy Duty Cage Clamp Type Connector For Power And Control 16 Pin consisting Of Following Items: (i) Male Insert-01 No (ii) Female Insert-01 no (iii) Male Crimp Pin-16 Nos (iv)female Crimp Pin-16 Nos (v)base With Two lever -01 No (vi) Hood-01 No, As Per A 2026-01-28
-Package-8-Recovery-And-Reconstruction-Of-2-Nos.-Roads-Within-38th-(lava-Lingsay)-Constituency,-Pedong-Block,-Kalimpong-District,-Under-National-Disaster-Response-Fund-(ndrf)-And-State-Disaster-Response-Fund-(sdrf)>India -Package-8-Recovery-And-Reconstruction-Of-2-Nos.-Roads-Within-38th-(lava-Lingsay)-Constituency,-Pedong-Block,-Kalimpong-District,-Under-National-Disaster-Response-Fund-(ndrf)-And-State-Disaster-Response-Fund-(sdrf)>Sdrf Package 8
Package 8 Recovery And Reconstruction Of 2 Nos. Roads Within 38th (lava Lingsay) Constituency, Pedong Block, Kalimpong District, Under National Disaster Response Fund (ndrf) And State Disaster Response Fund (sdrf)
-Package-8-Recovery-And-Reconstruction-Of-2-Nos.-Roads-Within-38th-(lava-Lingsay)-Constituency,-Pedong-Block,-Kalimpong-District,-Under-National-Disaster-Response-Fund-(ndrf)-And-State-Disaster-Response-Fund-(sdrf)>2026-01-28
-Package-9-Recovery-And-Reconstruction-Of-2-Nos.-Roads-Within-38th-(lava-Lingsay)-Constituency,-Pedong-Block,-Kalimpong-District,-Under-National-Disaster-Response-Fund-(ndrf)-And-State-Disaster-Response-Fund-(sdrf)>India -Package-9-Recovery-And-Reconstruction-Of-2-Nos.-Roads-Within-38th-(lava-Lingsay)-Constituency,-Pedong-Block,-Kalimpong-District,-Under-National-Disaster-Response-Fund-(ndrf)-And-State-Disaster-Response-Fund-(sdrf)>Sdrf Package 9
Package 9 Recovery And Reconstruction Of 2 Nos. Roads Within 38th (lava Lingsay) Constituency, Pedong Block, Kalimpong District, Under National Disaster Response Fund (ndrf) And State Disaster Response Fund (sdrf)
-Package-9-Recovery-And-Reconstruction-Of-2-Nos.-Roads-Within-38th-(lava-Lingsay)-Constituency,-Pedong-Block,-Kalimpong-District,-Under-National-Disaster-Response-Fund-(ndrf)-And-State-Disaster-Response-Fund-(sdrf)>2026-01-28
India Provn Of 63 Kva Dg Set, Isolation Transformer Alongwith Connected Items And Approach Path At Xxxxxx At Zakhama Mil Stn 2026-01-28
Whats app